| 1 | SUB-STATION PART:-33/11 KV 5 MVA Transformer |
| 2 | 11 KV VCB 600/300/5A , 350 MVA I/C |
| 3 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 4 | 3×300 mm2, 11 KV XLPE Cable |
| 5 | 11 KV cable jointing kit 3×300 mm outdoor heat shrinkable Type |
| 6 | 11 KV cable jointing kit 3×300mm indoor heat shrinkable Type |
| 7 | 11 KV 3×185 mm2 XLPE Cable |
| 8 | 11 KV cable jointing kit 3×185 mm outdoor heat shrinkable Type |
| 9 | 11 KV cable jointing kit 3×185 mm Indoor heat shrinkable Type |
| 10 | Making of 11 KV Cable Box and mounting on Switch Gear and Transformer |
| 11 | Digging & Laying of 11 KV Cable including cost of sand & Bricks |
| 12 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 13 | Plinth & foundation of 33 KV VCB/MOCB |
| 14 | Control Panel I/C for 33KV Single T/F |
| 15 | 33 KV C.T 200/100/1A |
| 16 | Structure of 33 KV CT (125x65x6MM G.I. Channel) |
| 17 | 33 KV PT 33 KV/110 volt |
| 18 | Structure for PT |
| 19 | 33 KV LA |
| 20 | Structure of 33 KV LA (125x65x6MM G.I Channel) |
| 21 | 33 KV Fuse Set |
| 22 | Structure of 33KV Fuse set (125x65x6MM G.I Channel) |
| 23 | Line Isolator |
| 24 | 33 KV Bus Isolator |
| 25 | Structure of 33 KV Line & Bus Isolator (125x65x6MM G.I Channel) |
| 26 | 33 KV Post Insulator |
| 27 | Structure of 33 KV Post Insulator (125x65x6MM G.I Channel) |
| 28 | Bus Bar Gantry Complete with Top Channel, Bressing Set Dropper Channel, 33 KV Disc Insulator & Fitting, 33 KV Pin Insulator with Pin, PG Clamp, Stone Pad etc |
| 29 | 24 Volt Battery & Battery Charger with Cabinet & Hygroscop Meter etc. |
| 30 | Plinth for New 5 MVA Transformer as per RESPO |
| 31 | Rail Pices 90 lbs |
| 32 | G.I. Structure For cable support & \\"L\\" Type Structure for Neutral |
| 33 | 2×2.5 mm2 Control Cable Armoured Type |
| 34 | 4×2.5 mm2 Control Cable Armoured Type |
| 35 | Laying of various typt of above mentioned control cables |
| 36 | Pipe Earthing of Power Transformer by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm. dia. Into the ground up to the water lever to the lower end of which a solid copper con approx 9 inches long and 750 gram in weight provided and screwed in connecting and bringing out continuous copper wire 8 SWG from the cone to the ground surface where it will be bolted to the G.I. Earth strip for transformer neutral connection. The earth strip will be welded to the G.I. pipe. The work also includes cap and clamp for pouring water, the cost of all material with all labour and T&P etc. complete in all respect. |
| 37 | Chemical Pipe Earthing as per DVVNL approved G.T.P. |
| 38 | GI pipe 160 mm dia (3 Mtr long) over the 3x300/185 sqmm XLPE cable |
| 39 | Holding Clamp for 3×300 XLPE 11 KV Cable |
| 40 | M.S. Nut Bolt off size with washer |
| 41 | ACSR Dog Conductor |
| 42 | P.G Clamp For Dog Conductor |
| 43 | Outdor Earthing (Eartmat, Delta) |
| 44 | Indor Equipment Earthing for 11 KV VCB (Delta) |
| 45 | PCC Pole 8.5 Mtr. Long |
| 46 | SWITCH YARD LIGHTING ARRANGMENT Stone Pad -6 No, Concreting of supports - 6 No. PVC Cable 2×10 mm2 armor for switch Lighting -200 Mtr, PVC conduct pipe for PVC cable- 150 Mtr Construction of Board in Control Room with below assesories-1. Sun mica Board 2x3 ft. Including (MCB Box with 6 No. MCB + 1phase Isolator MCB) - 1 No.2. Change Over Main Switch 63 Amp. for three phase supply -01 No.3. Three phase for wire, Red yellow Blue Bulb including Holder and wiring)- 1 Job 4. LED Light 100 W (ISI Mark) -8 No. 5. 15 Amp. LED Light Contral Switch Button - 8 No.6. Kit-kat fuse-4 No.63 Amp. |
| 47 | Connector For Power T/F for 33 KV & 11 KV Busing Rod Connections |
| 48 | Top Chhannel 125x65x3200 |
| 49 | 33 KV Polymer Pin Insulator |
| 50 | Paint on 5 MVA Power T/F by compressor Machine (Atleast 2 times Cotting) |
| 51 | Carriage of following material from Center Store to Site: 11 KV VCB 600/300/5A , 350 MVA I/C |
| 52 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 53 | 3×300 mm2, 11 KV XLPE Cable |
| 54 | 11 KV 3×185 mm2 XLPE Cable |
| 55 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 56 | Control Panel I/C for 33KV Single T/F |
| 57 | 33 KV C.T 200/100/1A |
| 58 | 33 KV PT 33 KV/110 volt |
| 59 | ACSR Dog Conductor |
| 60 | PCC Pole 8.5 Mtr. Long Please Enable Macros to View BoQ information |