| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) |
| 2 | PCC Poles (8.5 Mtr Long) |
| 3 | 250 KVA |
| 4 | 63 KVA T/F |
| 5 | LT AB cable (3x95+1x70+1x16sq.mm.) |
| 6 | LT AB cable (3x50+1x35+1x16sq.mm.) |
| 7 | Three Phase Distribution Box. |
| 8 | Other line materials |
| 9 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 10 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 11 | Earthing of pole as per RESSPO U.P.P.C.L. drawing/norms.. |
| 12 | Laying, Stringing & Sagging of LT AB cable (3x95+1x70+1x16sq.mm.ABC Cable up to proper sag for the following size cable |
| 13 | Laying, Stringing & Sagging of LT AB cable (3x50+1x35+1x16sq.mm.).ABC Cable up to proper sag for the following size cable |
| 14 | Fixing of Three Phase Distribution Box. |
| 15 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 16 | 250 KVA |
| 17 | 63 KVA on double pole |
| 18 | Dismounting of following capacity of T/F from double pole safly and safe cartage of T/F from work to Electricity Store Centre, Balrampur with loading & unloading. |
| 19 | 100 KVA |
| 20 | 25 KVA T/F |
| 21 | Construction of 250/400 KVA T/F plinth 2x2x1.5 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4\\" thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per UPPCL Norms. |
| 22 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wire mesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8'(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint. The wire mesh should be earthed with 50x6 MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication. transportation and installation. |
| 23 | Providing & fixing of tailless unit 500 Amp. (3 No.) With properly paint with Red Oxide paint and Yellow colour paint as well as required, Lug, copper L Piece, fuse wire and nut & bolt. (All the material required for above work shall be provided by the Contractor on his own cost) (Any other material required for completion of work but not mentioned above shall be provided by the contractor at his own cost No extra cost shall be paid to contractor for these material) |
| 24 | Earthing of distribution T/F's for body & neutral upto water level with GI Pipe of 1.5\\" Dia. Including GI strip size 35x6 mm. (all material will be supplied by Contractor). |
| 25 | Decentralized materials:-Providing and fixing of following materials as per sanctioned Estimate/Package as per RESSPO U.P.P.C.L. drawing/ norms.(where is required). |
| 26 | Suspension clamp with I hook |
| 27 | I hook |
| 28 | LT Fuse Set. |
| 29 | LT PVC cable Al 1x120sq.mm. |
| 30 | LT PVC cable Al 1x400sq.mm. |
| 31 | Lug Sutable for 250 KVA Please Enable Macros to View BoQ information |