| 1 | 33 KV Link line Underground (Double Circuit 700x2 1400 Meters) From Patel Nagar Intersection to court till Kachehri Complex, 33 KV Link line Underground (D/C) 3x300 sq mm xlpe cable from Patharkata Chauraha to Muraintola S/S (370 Mtr.) & Strenthing of old over head 33 KV Line Under S/S Muraintola and 33 KV Link line Underground (D/C) 3x300 sq mm xlpe cable from Patharkata Chauraha to Muraintola S/S (370 Mtr.) , U/G Road Crossing at Bullet Chauraha (2x90 Mtr.) Under S/S Muraintola Distt.-Fatehpur |
| 2 | Supply of De-Centralised Materials |
| 3 | Cable jointing kit for 3x300 XLPE 33 KV |
| 4 | NUT BOLT WITH WASHER OFF SIZE |
| 5 | G.I.PIPE 6\\" DIA |
| 6 | HDPE Pipe 6\\" Dia |
| 7 | 33 KV BRACING CLAMP WITH NUT & BOLT |
| 8 | TOP CHANNEL CLAMP FOR 11/13 MTR. ST POLE and 9 Mtr. PCC Pole |
| 9 | DANGER BOARD WITH CLAMP FOR 33 KV LINE |
| 10 | BARBED WIRE |
| 11 | Aluminium Paint |
| 12 | Red oxide Paint |
| 13 | 33 KV Cross Arm Holding Clamp |
| 14 | 33 KV Guarding Angle Clamp |
| 15 | Carriage of following material |
| 16 | PCC/STP Pole, 33 KV V-type cross arm, 33 KV M.S Top channel, 33 KV Disc Fitting, 33 KV Disc Insulator, 33 KV Pin Insulator, 3x300 sqmm 33 KV XLPE Cable, ACSR Dog Cond. 33 KV Cable jointing kit 3x300 sqmm, 33 KV Bracing clamp, 33 KV P.G Clamp etc. |
| 17 | Erection work |
| 18 | Digging of pits of size 0.45x1.25x 1.80 mtr. for erection of PCC/STP pole 11 mtr. Long. |
| 19 | Digging of pits of size 0.45x1.25x 2.10 mtr. for erection of STP pole 13 mtr. Long. |
| 20 | Erection of single STP 11/13 mtr long and SP/DP/TP/FP. |
| 21 | Mounting and fitting of V-type cross arm, 33 KV pin, pin insulator, earth clamp complete in all respect as per drawing of RESPO on single STP pole 11/13 mtr long. |
| 22 | Fabrication, mounting and fitting of M.S Channel ,33 KV disc insulator and disc fitting on STP . double pole for riser |
| 23 | Painting of single STP pole 11/13 mtr long . |
| 24 | Grouting of ST pole 11/13 Mtr. Long/PCC Pole 9 Mtr. with cement, sand and brick bllast ratio 1:4:8 size 0.45x 0.45x 1.5 mtr deep under the ground as per drawing No. RES-6. Cement, sand, brick, ballast shall be provided by the contractor. |
| 25 | Laying 3x300 Sqmm 33 KV XLPE Cable in HDPE Pipe Road Crossing All material shall be provided by Contractor. |
| 26 | Installation and Fixing of 33 KV Cable Box Jointing Kit 3x300 Sqmm |
| 27 | Guarding of 33 KV Line for Road Crossing and Marcket. |
| 28 | Trimming of tree branch big/small branch which is laying in alignment of 33 KV line. Please Enable Macros to View BoQ information |