|
| 1 | Excavation in foundation in ordinary soil (Loam,clay or sand ) including lift upto 1.50 m and lead upto 30m , including filling watering and ramming of excavated earth into the trenches and removal & disposal of surplus earth as directed by the Engineer-in-charge up to the distance of 30.00m from the foundation trench ... complete item DSR 2.6.1 |
| 2 | Cement Concrete with 4 cm gauge stone ballast , Coarse sand and cement in the proportion of 1:4:8 including supply of all material and labour, Tools & Plants etc. required for proper completion of the work.DSR 4.1.8 |
| 3 | Brick work in 1:6 cement Coarse sand in foundation and up to plinth …. Complete item 6.1.2 |
| 4 | 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) DSR 5.1.3 |
| 5 | 1:1:5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)DSR 5.2.2 |
| 6 | 1:1:5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)DSR 5.3 |
| 7 | M.S (Tor steel or plain ) in plain work such as R.C.C or R.B work including cutting / bending for proper shape as necessary including supply of all steel & wastage ,bend ,hook & authorised overlapping shall be measured … complete item. |
| 8 | Brick work in 1:4 cement Coarse sand in superstructure …. Complete item DSR6.4.1 |
| 9 | Centering and shuttring … complete item |
| 10 | Coloumn |
| 11 | 12 mm plaster of mix 1:4 (coarse sand) |
| 12 | 15 mm plaster of mix 1:4 (coarse sand) outer side |
| 13 | Finishing Walls with putty approved brand and manfacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material labour T&P etc required for proper completion of work |
| 14 | Finishing wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of the work13.45.1 |
| 15 | M.S. or Iron work in angle Iron Door and window frame Including cutting, welding & wastage including supply of all material, labour T&P etc. required for proper completion of the work. Excluding 10.15.1 |
| 16 | Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. mt.) of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the13.62.1 |
| 17 | Providing & Laying of GSB for sub .....complete item. A/R |
| 18 | Providing & Laying 80 mm thick interlocking tiles complete item |
| 19 | Providing & Fixing 18mm granite stone... complete item. 8.2.2 |
| 20 | Supply and fixing of Board Please Enable Macros to View BoQ information |