| 1 | Detail of Work |
| 2 | Safely cartage of PCC Pole 8.5/9/11 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 20 KM.) |
| 3 | Providing And fixing of Stone Pad 300x300x75mm |
| 4 | Safe cartage of 25/63/100 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 5 | Safe cartage of 11 KV Fuse Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 6 | Safe cartage of 11 KV TPMO from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 7 | Safe cartage of ABC Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 8 | Safe cartage of Rebbit Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 9 | Safely Cartage of 11 KV XLPE Cable (3x120sq.mm) from ESC SRE to Site of work including loading and unloading at both ends. |
| 10 | Safe cartage of 250 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 11 | Constriction of plinth for installation of 250 kv T/F of size 2x2x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 12 | Safe installation of 250 KVA T/F on the Plinth with complete fittings including making connections and commissioning. |
| 13 | Wire mesh fencing of 250 KVA T/F size 2.5x2.5x2.5 mt. grouting making frame of MS angle 45x45x6 mm and fixing four no. MS strip size 25x6 mm at equal distance in between the frame and fixing square mesh 50 mm square in each frame the fencing should cover all side of T/F with providing 1 No. door size 6'x3' with sitakni & Dandala with painting of Fencing. |
| 14 | Chemical Earthing of 250 KVA T/F |
| 15 | Providing and fixing of Double Circuit Tail less unit 500 Amp incoming circuit connected with copper bus bar of proper ratting for 250 KVA T//F in the frame made of MS Angle 45x45x5 mm fitted with GI Nut & Bolt Ground Level as per site requirement (With grouting ). |
| 16 | Fabrication & Erection of double Pole on PCC poles up to 8.5/11 Mtr Long with complete fitting with all accessories complete. |
| 17 | Safe installation of 25/63/100 KVA T/F on the double pole with complete fittings including making connections and commissioning. |
| 18 | Safely Installation of 11 KV Fuse set and connection properly. |
| 19 | Safely Installation of 11 KV TPMO and connection properly. |
| 20 | Laying of 11 KV XLPE Cable size 3x120 sq,mm |
| 21 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line including complete. |
| 22 | Making and Filling the 11 KV cable jointing kit indoor/outdoor type size 3x120 Sqmm. sq.mm as per RESPO specification. |
| 23 | Providing and fixing MS Channel 100x50x2028 mm |
| 24 | Providing and fixing MS Angle 65x65x2028mm |
| 25 | Providing and fixing Copper L-Piece |
| 26 | Fixing of 11 KV Disc insulator |
| 27 | Fixing of 11 KV Disc Fitting |
| 28 | Fixing of 11 KV Polymeric Pin Insulator 11 KV with pin |
| 29 | Providing and fixing of Danger Board with clamp |
| 30 | Providing and fixing of Danger Board with clamp barbed wire 4 Kg |
| 31 | Providing and fixing Barbed wire |
| 32 | Providing and fixing Dead & Clamp |
| 33 | Providing and fixing Suspension clamp |
| 34 | Providing and fixing Suspension clamp with J-hook |
| 35 | Providing and fixing of J-hook with clamp |
| 36 | Providing and fixing of LT Lug 150 MM |
| 37 | Providing and fixing LT Fuse Set protection unit for 100 KVA DT with SMC Box |
| 38 | Providing and fixing Distribution Box Clamp |
| 39 | Fixing of Distribution Box |
| 40 | Erection of single support on PCC Pole up to 8.5/9/11Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 41 | Concreting of Pole |
| 42 | Earthing of pole/TF MS Earthing Road of 20x2500 mm & 6SWG earthwire etc |
| 43 | Providing and fixing of All type Clamp |
| 44 | Providing and fixing of Nut & Bolt defference size |
| 45 | Fixing of 11 KV stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/8 SWG and fitting the same on the pole |
| 46 | Providing and fixing of AI LEG LONG BARREL OFF SIZE (LS) |
| 47 | Providing and fixing of LT INCOMING PANNEL WITH METERING EQUIPEMENT |
| 48 | Removal of 10/16/25/63/100 kva t/f from the D/P and cartage site of work to ESC SRE including loading and unloding at both ends |
| 49 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x50/3x95/3x120 sq.mm. including fixing of all accessories. |
| 50 | Laying of Connecting lead 1x16 sq.mm/LT PVC Cable 3.5x150/3.5/70/LT XLPE Cable 1x400sq.mm Please Enable Macros to View BoQ information |