| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil |
| 2 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 4 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020) |
| 5 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 7 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. |
| 8 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. |
| 9 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath) |
| 10 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) |
| 11 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. |
| 12 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. |
| 13 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb |
| 14 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. |
| 15 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) |
| 16 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 17 | Sub Total |
| 18 | GST 18% |
| 19 | CESS 1% Please Enable Macros to View BoQ information |