| 1 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 2 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 4 | One or more coats on old work |
| 5 | Providing, laying, testing & commissioning of 'C' class heavy duty MS pipe conforming to IS 1239/Class -II of IS: 3589 including Welding, fittingslike elbows, tees, flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required : |
| 6 | 80 mm dia |
| 7 | Servicing, Reparing, Testing, Replacement of defective parts and setting of parameters and microprocessor of Machine No. 1 to 3 of 40 TR (Total 120 TR) complete in all Respect. |
| 8 | Providing Fixing and Testing of Chiller Water Sensor Installation as per company Machine specification in all respect. |
| 9 | Supplying and filling of Refrigerant R-22 with vaccum Testing, Pressure testing complete in all respect, defect & Rectify leakage etc . |
| 10 | Pressure Testing of Chiller With Dry N1 Leak test , Leak Repair, vaccumising of system including gas charging complete in all Respect. |
| 11 | De-scalling of Machine with roding and with the help of pump and necessary requirement such as nitric acid or cleaner Complete in all Respect. |
| 12 | Repair, Rewinding and Overhauling of 7.5 HP Chiller Pump and Condensor Pump Motor including replacement of defective parts wiring of suitbale size F Class insulation paper glass, tape holder, climber mica sheet epoxy shae brazing, NDE Bearing, DE Bearing, Pump Shaft Sleeve, Pump Sela, Pump Shaft Balancing, Cooling Fan of Pump Motor, Hardware Acessories, Nut, Bolt, Voute Gasket complete as per site requirement 02 Nos. Ball bearing for both side including dynamic balance of rotors, labour including alignment of the motor with pump and labour charges for carriage of motor with six month gurantee of replaced parts and copper winding to the entire satisfaction of EIC. |
| 13 | Repair and Service of Chiller / Condenser water line strainer with defective parts (S.S Filter), nut bolt etc. complete in all respects of 1 mm thickness. |
| 14 | Dismentling, Repair and rewinding of AHU motor 3 phase including rewinding rebushing and refiting including replacement of all defective items as required, including the cost of nuts bolts, ruber sheet, bearing, Labour etc. complete. Please Enable Macros to View BoQ information |