| 1 | Centring and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform |
| 2 | Centring and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more. |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) |
| 6 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 9 | Hiring & operation of Hydraulic Excavator JCB Machine for 8 Hrs. of capacity 3D on the charges basis at site including driver, diesel, M. Oil etc. complete, standard size JCB in required numbers as per direction of Engineer-in-charges for 8 hours minimum running per day. |
| 10 | Hiring and Operation of tipper of 8 cum minimum capacity for 8 working hours, upto 40km lead (Standard size of tipper) for disposal of silt, sludge, building rubbish etc. on hire charges basis at site i/c. driver, diesel, helper, POL etc. complete in required as as per direction of Engineer-in-charge. |
| 11 | Providing service of Beldar for repair work for 08 working hours in a day duty as and when required as per direction of Engineer in charge. |
| 12 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland Cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: In case the cement content in design mix is more than the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.(a) Concrete of M25 grade with minimum cement content of 330 kg /cum |
| 13 | Providing and placing in position 150 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers of approved make etc. of M-30 grade with minimum cement content 390kg/cum for RCC work, including cost of centering, shuttering with top & bottom longitudinal reinforcement of 12 mm dia @ 100c/c and 8 mm dia stirrups @ 150c/c and providing 2 Nos. 12 mm dia bar for lifting 0.60 mtr length hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 14 | DSR 2023 correction factor is 0.973 as per OM 158/SE (TAS)/GST/2024/02-E dt.08/08/2024 |
| 15 | Less cost index @ 0.09% |
| 16 | Initial Desilting of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / super sucker / pumps / jetting machines / any other suitable mechanical means including opening/closing/placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge within Upto 15th June 2025. The rates includes all above operations including including opening/closing/placing/refixing of Manhole cover/SFRC Cover/Drain Cover, taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. (The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item no 17.Drains above 600mm upto 1200mm in width and all depths / drains upto 1200 mm dia pipes. |
| 17 | Cleaning / desludging / desilting of drains/ sumps /culverts by Poclain machine including excavation and taking out silt, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish by manual or any other suitable mechanical method and disposal of this desilted material, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish received after desilting of drains for all lifts & lead upto 50 meters as per the direction of Engineer-in-Charge including submitting 02 albums weekly consisting of atleast 20 coloured post card size photographs (2 hard copies of each coloured photograph of postcard size) and a digital soft copy of the entire album. Payment for the work shall be released only 60% in RA Bills for the execution of the quantity & remain 40 % shall be released only after successfully completion of the work & also completion of the financial year during which work has been executed. The operation shall include (i) Supply of all materials, labour T&P.(ii) Arrangement of all safety measures as per provision / guidelines as per IS 11972-1987 & international standard including arrangement of gas detector, forced air ventilators etc. wherever required. (iii) Observing all norms/guidelines of National Green Tribunal or Department of Environment or other statuary body as per the law of land.(iv) Removal of all hindrances/obstruction, unforeseen items, permission from other department (Department will only assist in getting the permission etc.) cutting bituminous road, excavation/demolishing of brick work, cement concrete, RCC wherever required and restoring the same. The payment shall be deducted as per schedule mentioned in the contract for the portion of drain not desilted properly or not maintained properly as per recovery schedule mentioned in the contract.(v) Arrangement of traffic control devices, traffic approval wherever required, barricading, display of sign board, insurance of labour & machinery(vi) Videography & Photography of desiting operation (As mentioned in NIT) Payment will be made on production of video & photos of desiting operation.(vii) The work includes the safe disposal of waste obtained from the above desilting operation (the cost of disposable of malba shall be paid under a separate item ).(viii) Entire system is necessary to equipped with GPS is working condition & agency will also submit. The GPF printout for the execution of the work on daily basis on next day of execution to the Engineer-in-Charge.(ix) Agency will also produce/submit necessary evidence/receipt slips for disposal of sludge/silt/debus or floating material etc. at MCD approved recycling/dumping ground. Payment will be released only after satisfactions work proper disposal (Payment for processing charges paid to MCD shall be reimbursed separately) For drains above 1500mm width and all depths . |
| 18 | Regular (on daily basis) desiltig of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge. The rates includes all above operations including taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground to be arranged by agency. (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. (The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid separately under agreement item. Note:- The payment under this agreement item is for regular desilting of any stretch of drain and will be made once only after its regular desilting for a period of four months and not on monthly basis though the rates indicated in agreement items are for per metre per month. Regular cleaning of bell mouth and numbering of bell mouth is also included in this item.Drains above 600mm upto 1200mm in width and all depths / drains upto 1200 mm dia pipes.For the period from July to September 2026 |
| 19 | For the period from October to January 2027 |
| 20 | For the period from February to May 2027 |
| 21 | Disposal of silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish / similar unserviceable dimantled or waste materials by mechanical means/including loading, transporting and unloading the same at any authorized Municipal/ any other Dumping Ground including weighing at plant etc. complete as per direction of Engineer-in-charge. Weighing and unloading at the plant shall be as per procedures/ rules of the Dumping Ground Management. The rates are inclusive of all operations, labours, leads and lifts from site of work to the authorized Municipal/ any other Dumping Ground. (Processing fees at prescribed rate of dumping ground will be deposited by the agency and shall be reimbursed by the department on production of only original cash receipts). (Payments for disposal under this item will be made on production of original Municipal dumping ground receipts), the agency shall also submit pre & post photograph in soft/hard copy. |
| 22 | Credit of old dismantled MS steel/MS Angle/MS Flat/MS Bar etc. received after dismantling at site all complete as per direction of Engineer-in-Charge. |
| 23 | Deduct for the credit on account of cost of dismanltled unserviceable bricks received from dismantling , including dismantling removal & disposal from the site and cleaning the site all complete as per the direction of Engineer-in-charge complete. The dismantled unserviceable material shall become the property of contractors after dismantling duly weighed/measured before removing from the site in the presence of Engineer-in-charge or his authorised respective. Please Enable Macros to View BoQ information |