|
| 1 | Detail of Work |
| 2 | Safely cartage of PCC Pole 8.5/9/11 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 40 KM.) |
| 3 | Safely cartage of STP Pole 9/11/13 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 40 KM.) |
| 4 | Safe cartage of Line Matrial from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 5 | Safe cartage of 25/63 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 6 | Safe cartage of 11 KV Fuse Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 7 | Safe cartage of 11 KV TPMO from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 8 | Safe cartage of ABC Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto40 km.) |
| 9 | Safe cartage of Rebbit Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 10 | Safe cartage of Weasel Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 11 | Safe cartage of 11 KV XLPE 3x70 sq.mm from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 12 | Providing and laying of Armoured Cable |
| 13 | Fabrication & Erection of double Pole on PCC/ST poles up to 8.5/11/13Mtr Long with complete fitting with all accessories complete. |
| 14 | Safe installation of 25/63/100 KVA T/F on the double pole with complete fittings including making connections and commissioning. |
| 15 | Safely Installation of 11 KV Fuse set and connection properly. |
| 16 | Safely Installation of 11 KV TPMO and connection properly. |
| 17 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Line including complete. |
| 18 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line including complete. |
| 19 | Laying, of 11 KV XLPE Cable 3x70 sq.mm |
| 20 | Fixing of Jointing kit sit 3x70 sq.mm outdoor type |
| 21 | Fabrication of Channel and Angle |
| 22 | Providing and fixing of Danger Board |
| 23 | Providing and fixing of Number Plate |
| 24 | Providing and fixing Barbed wire |
| 25 | Providing and fixing Dead & Clamp |
| 26 | Providing and fixing F-clamp |
| 27 | Providing and fixing PRC clamp |
| 28 | Providing and fixing of All type clamp with nut & Bolt |
| 29 | Providing and fixing of J-hook |
| 30 | Providing and fixing of LT Fuse Box |
| 31 | Erection of single support on PCC/ST Pole up to 8.5/9/11/13Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 32 | Concreting of Pole |
| 33 | Concreting of Stay |
| 34 | Earthing of pole/TF MS Earthing Road of 20x2500 mm & 6SWG earthwire etc |
| 35 | Providing and fixing of Nut & Bolt defference size |
| 36 | Fixing of Distribution Box 3 Phase |
| 37 | Fixing of 11 KV stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/8 SWG and fitting the same on the pole |
| 38 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x50/3x95/3x120 sq.mm. including fixing of all accessories. Please Enable Macros to View BoQ information |