| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | ST Pole 11 Mtr. Long |
| 3 | PCC Pole 8.5 Mtr |
| 4 | 11 KV Polymeric Pin INSULATOR with Nut |
| 5 | 11 KV Polymeric Disc Insulator B&S Type |
| 6 | STAY SET COMPLETE |
| 7 | ABC(3X95+1X70+1X16)/(3x120+1x95+1x16) Sqmm. |
| 8 | 11 KV (3X70/120/185)/(1x400/630) XLPE |
| 9 | Distribution Transformer 100 KVA |
| 10 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 11 | Mounting of 100 KVA Transformer on D/P structure as per RESPO Norms (Except T/F all the materials will be supplied by the contractor ) |
| 12 | Complete GEM Earthing |
| 13 | Fabrication, erection of single 11 Mtr ST/8.5 PCC Pole with fixing of necessary clamps, accessories required including supply & fixing of clamp, nuts & bolts, Grouting with cement, sand, brick ballast in ratio :1:4:8 and earthing as per RESPO specification & direction of E/I with fixing of T-off with fitting & tapping pole. (Only Pole shall be Supplied by the deptt.) |
| 14 | Installation of LT FUSE PROTECTION UNIT FOR 100 KVA T/F(All material shall be supplied by the contractor.) |
| 15 | Providing and fixing of copper L Pieces with suitable nuts and bolt for100 kva transformes with proper disconnection and reconnection. |
| 16 | Fabrication erection of Substation D/P on 9/11 Mtr. ST pole Long with fixing of necessary clamps accessories required including supply and fixing of straight MS Channel 100x50 mm. (2240 mm long ) one Nos with arrangement of fixing 3 Nos. pin insulator,(ST pole/ PCC Pole supplied by the deptt). |
| 17 | Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor ) |
| 18 | Grouting of ST/PCC pole |
| 19 | Painting of ST/PCC pole |
| 20 | Providing and fixing of TPMO |
| 21 | Providing and fixing DO fuse set |
| 22 | `Providing and fixing Nut and bolts |
| 23 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 24 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 25 | Grouting & concreting of stay rod 1800x16 mm. Fixing , tighting and nozzling of stay wire with the pole of required tension with clamps as per RESPO schedule, complete in all respects |
| 26 | Providing and Fixing of M.S. channel |
| 27 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 28 | Providing and fixing ALU LUG OFF SIZE |
| 29 | Providing & Fixing of I-Hook (Insulated) for above clamps with bolts & nut. |
| 30 | Providing & Fixing of J-Hook (Insulated) for above clamps with bolts & nut. |
| 31 | Providing and fixing of danger board |
| 32 | Part-B |
| 33 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 34 | 11 KV 3x185 sq.mm XLPE cable |
| 35 | 9/11 Mtr long ST pole |
| 36 | 11 KV cable box straight thru |
| 37 | 11 KV cable box O/D |
| 38 | 11 KV VCB FOR OG CTR 200/100/5. |
| 39 | Fabrication, erection of cable exposure on 11 Meter long ST pole with fixing of necessary clamps, accessories required including supply and fixing of straight Ms 100x50mm Top channel (2240mm long) One no, dropper channel 100x50mm (2240mm long) 2 Nos, with arrangement of fixing 3 nos. pin insulator, along with 11 KV DO Fuse set as per RESPO spenc & direction of E/I. ST Pole shall be supplied by the deptt. |
| 40 | Fixing of M.S. channel |
| 41 | Earthing of poles as per RESPO norms . (All the materials supplied by contractor) |
| 42 | Grouting of poles with help of cement sand & brick ballast. |
| 43 | Painting of pole |
| 44 | Laying of 11 KV 3x185 sq.mm XLPE cable by manual method |
| 45 | Hoisting of cable with the help of GI pipe 4\\" dia each having length of 3 meter along with supply and fixing of MS brackets and GI pipe. |
| 46 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 47 | High presure testing of cable |
| 48 | Providing and fixing of danger board |
| 49 | Providing and fixing of cable route marker |
| 50 | Providing and fixing of under ground warning tape |
| 51 | Installation of 11KV I/C &O/C VCB as per norms. |
| 52 | Chemical earthing of VCB. |
| 53 | Complete testing of VCB. |
| 54 | Disconnection and reconnection work. Please Enable Macros to View BoQ information |