| 1 | PART-A |
| 2 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to JE Dump Store (distance approx 20 Km). |
| 3 | Distribution Transformer 250 KVA |
| 4 | LT XLPE Cable (1x240/400/630) Sqmm. |
| 5 | 3 Phase DP Box |
| 6 | PCC POLE 8.5 Mtr. Long |
| 7 | ABC (3x120+1x95+1x16) Sqmm. |
| 8 | ACSR RABBIT CONDUCTOR |
| 9 | Laying of XLPE Cable (1x240/400/630)/ (3.5x240/400/630) Sqmm.Sqmm cable with Material. (Only Cable shall be supplied by department) |
| 10 | Demounting of 100 KVA Distribution transformer from existing plinth after opening of all connections and opening of wire mesh fencing & safe carriage upto Central store & safe unloading. |
| 11 | Mounting of 250 KVA Transformer on plinth with making all connections & fixing all requisite items/equipments as per RESSPO,s specn and safe energizsation after connecting body & neutral of transformer to earth. only transformer shall be supplied by deptt. |
| 12 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 13 | Sagging of ACSR weasel /Racoon conductor as per RESPO norms and in the directions of supervising Engineer including cradle type guarding] fixing/mounting of material clamps fitting etc, |
| 14 | Providing and fixing of TPMO |
| 15 | Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor ) |
| 16 | Providing and Fixing of M.S. channel |
| 17 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 18 | Providing and fixing DO fuse set |
| 19 | Construction of Transformer plinth of size 2x2x1.5 meter with the help of first class brick and masonry in the ratio 1:4 cement & sand coare. Filling the structure completely as per norms with RCC top 1:1:2 cement, sand coarse and stone grith with MS Bar and MS channel for resting transformer wheel 2x(125x65x2000)mm and plaster. (All material shall be arranged by the contractor.) |
| 20 | Construction of massonary type distribution piller box with first class brick ballast cement coarse sand, local sand, brick ballast and MS round bar of 10 mm. Dia including fixing of 3 Nos 500 Amp/650 Volt fuse unit with Copper Busbar etc. (All material shall be supplied by the contractor.) |
| 21 | Fabrication, erection of wire mesh fencing 2.0 Mtr. Height on cement boundry/base of height 1.0 fits including grouting of fabrication MS Angle 50x50x6 mm. Painting of fencing and support with all material as per specification around 11/.4 KV Sub-Station (All material shall be supplied by the contractor.) |
| 22 | GEM TYPE EARTHING (All the material will be arranged by the contractor) |
| 23 | Carriage, loading-unloading with proper stacking of old TF from Site to Central Store /department store/substation to distance approx 20 Km. |
| 24 | Providing and fixing of copper L Pieces t for 250kva transformers with proper disconnection and reconnection. |
| 25 | Providing and fixing AL Leg long barrel off size (LS) |
| 26 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 27 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 28 | Providing and fixing of stone pad |
| 29 | Providing and fixing of danger board |
| 30 | Grouting of ST/PCC pole |
| 31 | Supply and fixing at different size nuts and bolts. |
| 32 | Supply and fixing of 4core LT MCB with box |
| 33 | Supply and fixing of LT CONEECTOR FOR TPYE MA |
| 34 | Gravels (Pebbles stone/Rivers peebles/Crushed granite) inside 11/0.4 Sub-Station area B/W Plinth & Fencing. |
| 35 | PART-B |
| 36 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 37 | 11 KV 3x185 sq.mm XLPE cable |
| 38 | 9/11 Mtr long ST pole |
| 39 | 11 KV cable box straight thru |
| 40 | 11 KV cable box O/D |
| 41 | 11 KV pin insulator with pin |
| 42 | 11 KV VCB FOR OG CTR 200/100/5. |
| 43 | Fabrication, erection of cable exposure on 11 Meter long ST pole with fixing of necessary clamps, accessories required including supply and fixing of straight Ms 100x50mm Top channel (2240mm long) One no, dropper channel 100x50mm (2240mm long) 2 Nos, with arrangement of fixing 3 nos. pin insulator, along with 11 KV DO Fuse set as per RESPO spenc & direction of E/I. ST Pole shall be supplied by the deptt. |
| 44 | Fixing of M.S. channel |
| 45 | Earthing of poles as per RESPO norms . (All the materials supplied by contractor) |
| 46 | Grouting of poles with help of cement sand & brick ballast. |
| 47 | Painting of pole |
| 48 | Laying of 11 KV 3x185 sq.mm XLPE cable by manual method |
| 49 | Hoisting of cable with the help of GI pipe 4\\" dia each having length of 3 meter along with supply and fixing of MS brackets and GI pipe. |
| 50 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 51 | High presure testing of cable |
| 52 | Providing and fixing of danger board |
| 53 | Providing and fixing of cable route marker |
| 54 | Providing and fixing of under ground warning tape |
| 55 | Installation of 11KV I/C &O/C VCB as per norms. |
| 56 | Chemical earthing of VCB. |
| 57 | Complete testing of VCB. |
| 58 | Disconnection and reconnection work. |
| 59 | Note : If, due to any circumstances, the plinth construction work is not feasible, then the 250 KVA transformer shall be installed on a double pole arrangement as per requirement. The cost of this work shall also be equivalent to the cost of plinth construction. Please Enable Macros to View BoQ information |