| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | ST Pole 11 Mtr. Long |
| 3 | PCC Pole 8.5 Mtr |
| 4 | V TYPE X ARM 65X65X6MM |
| 5 | 11 KV Polymeric Pin INSULATOR with Nut |
| 6 | F BRACKET |
| 7 | ACSR DOG CONDUCTOR |
| 8 | 11 KV Polymeric Disc Insulator B&S Type |
| 9 | STAY SET COMPLETE |
| 10 | ABC (3x120+1x95+1x16) Sqmm. |
| 11 | 3 Phase DP Box |
| 12 | 11 KV (3X70/120/185)/(1x630) XLPE |
| 13 | Distribution Transformer 100 KVA |
| 14 | Laying of PVC Cable (1x240/400/630)/ (3.5x240/400/630) Sqmm.Sqmm cable with Material. (Only Cable shall be supplied by department) |
| 15 | Stringing & sagging of AB Cable (3x95+1x70+1x16) /(3x120+1x95+1x16) Sqmm with proper jumpring and connections with required Clamps, jumpers, piering connector. (Cost of clamps etc. shall be borne by contractor) (Only Cable shall be supplied by department) |
| 16 | Sagging of ACSR weasel /Racoon conductor as per RESPO norms and in the directions of supervising Engineer including cradle type guarding] fixing/mounting of material clamps fitting etc, |
| 17 | Mounting of 100 KVA Transformer on D/P structure as per RESPO Norms (Except T/F all the materials will be supplied by the contractor ) |
| 18 | Boring type earthing of 11/0.4 KV Substation by boring and lowering of 100 fit deep 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor) (Earthing value should be 1 ohm). |
| 19 | Fabrication, erection of single 11 Mtr ST/8.5 PCC Pole with fixing of necessary clamps, accessories required including supply & fixing of clamp, nuts & bolts, Grouting with cement, sand, brick ballast in ratio :1:4:8 and earthing as per RESPO specification & direction of E/I with fixing of T-off with fitting & tapping pole. (Only Pole shall be Supplied by the deptt.) |
| 20 | Installation of LT FUSE PROTECTION UNIT FOR 100 KVA T/F(All material shall be supplied by the contractor.) |
| 21 | Providing and fixing of copper L Pieces with suitable nuts and bolt for100 kva transformes with proper disconnection and reconnection. |
| 22 | Fabrication erection of Substation D/P on 9/11 Mtr. ST pole Long with fixing of necessary clamps accessories required including supply and fixing of straight MS Channel 100x50 mm. (2240 mm long ) one Nos with arrangement of fixing 3 Nos. pin insulator,(ST pole/ PCC Pole supplied by the deptt). |
| 23 | Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor ) |
| 24 | Grouting of ST/PCC pole |
| 25 | Painting of ST/PCC pole |
| 26 | Providing and fixing of TPMO |
| 27 | Providing and fixing DO fuse set |
| 28 | `Providing and fixing Nut and bolts |
| 29 | Providing & Fixing of Suspension clamps (Insulated) with bolts & nut. |
| 30 | Providing & Fixing of dead emd clamps (Insulated) with bolts & nut. |
| 31 | Fixing of Distribution Box with proper clamps, nuts and bolts & taking connection from ABC to distribution for supply. |
| 32 | Grouting & concreting of stay rod 1800x16 mm. Fixing , tighting and nozzling of stay wire with the pole of required tension with clamps as per RESPO schedule, complete in all respects |
| 33 | Providing and Fixing of M.S. channel |
| 34 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 35 | Providing and fixing ALU LUG OFF SIZE |
| 36 | Providing & Fixing of I-Hook (Insulated) for above clamps with bolts & nut. |
| 37 | Providing & Fixing of J-Hook (Insulated) for above clamps with bolts & nut. |
| 38 | Providing & Fixing of ALUMINIUM SLEAVE FOR ACSR DOG CONDUCTOR |
| 39 | Providing and fixing of danger board Please Enable Macros to View BoQ information |