| 1 | Supplying, fixing/ installation, Testing and Commissioning of 1.0 Ton of 5-Star Split AC unit of (Inverter: Variable Speed) - Make 2026) suitable for wall mounting working on 230 Volts, 50 Hz,(100% Copper Coil) ** | Supplying, fixing/ installation, Testing and Commissioning of 1.0 Ton of 5-Star Split AC unit of (Inverter: Variable Speed) - Make 2026) suitable for wall mounting working on 230 Volts, 50 Hz,(100% Copper Coil) ** |
| 2 | Supply and installation of Double Booster Stabilizer - Make 2026 | Supply and installation of Double Booster Stabilizer - Make 2026 |
| 3 | Outdoor Stand (Supplying, fixing, Testing and Commissioning standard powder coated support brackets including fasteners and other accessories as required.) | Outdoor Stand (Supplying, fixing, Testing and Commissioning standard powder coated support brackets including fasteners and other accessories as required.) |
| 4 | Supply and installation of AC Timer | Supply and installation of AC Timer |
| 5 | Supplying, fixing, Testing and Commissioning for providing additional 100% copper pipes (one circuit), for the above split units with necessary insulation and with adequate PVC insulated copper wire from indoor to outdoor units concealed and taken through beyond the standard 3 meter length (which is provided by default) | Supplying, fixing, Testing and Commissioning for providing additional 100% copper pipes (one circuit), for the above split units with necessary insulation and with adequate PVC insulated copper wire from indoor to outdoor units concealed and taken through beyond the standard 3 meter length (which is provided by default) |
| 6 | Supplying, fixing, Testing and Commissioning for providing additional 25mm dia PVC drainpipe concealed and taken through wall/ partition beyond the standard 3 meter length (which is provided by default) for the above split units | Supplying, fixing, Testing and Commissioning for providing additional 25mm dia PVC drainpipe concealed and taken through wall/ partition beyond the standard 3 meter length (which is provided by default) for the above split units |
| 7 | Supplying, fixing, Testing and Commissioning for providing additional power cable beyond the standard 1 meter length (which is provided by default) for the above split units | Supplying, fixing, Testing and Commissioning for providing additional power cable beyond the standard 1 meter length (which is provided by default) for the above split units |