| 1 | dk;ZA |
| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-11 Mtr. PCC/ST Poles. |
| 3 | 09 Mtr. PCC Poles. |
| 4 | 8.5 Mtr. Long PCC Poles. |
| 5 | ACSR Weasel Conductor. |
| 6 | 11 KV Disc Insulator T&C type 4500kg. |
| 7 | 11 KV Disc fitting |
| 8 | 11 KV Pin insulator (Polymeric) with fitting |
| 9 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 10 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 11 | T/F 11/0.4 kV, 25 kVA |
| 12 | T/F 11/0.4 kV, 100 kVA |
| 13 | T/F 11/0.4 kV, 250 kVA |
| 14 | LT XLPE Cable AL. 1x240 sq.mm |
| 15 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 16 | 11 KV VCB I/C and O/G unit. |
| 17 | 33 KV VCB I/C and O/G unit. |
| 18 | 33 KV Control Pannel |
| 19 | 33 KV CT |
| 20 | 33 KV X Arm V type |
| 21 | 33 KV Pin insulator (Polymeric) with fitting |
| 22 | Stay set Complete |
| 23 | 11 KV fuse Set |
| 24 | 11 KV TPMO |
| 25 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 26 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel Conductor. |
| 27 | Sagging LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 28 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 29 | Making 2x2x1.5 mtr size Plinth for 250 KVA/400KVA transformer with 1 class brick and with all material and civil work as per respo norms. |
| 30 | Water level earthing of 250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 31 | Fancing of 250 KVA transformer |
| 32 | Plinth Repairing work of power T/F (Inc. all acces.) with Labour |
| 33 | Construction of Fire wall Between Power T/F with material and Labour |
| 34 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA Transformer. (Tail less unit should be provided by contractor) |
| 35 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 36 | Mounting and fixing 11 K.V Stay Set |
| 37 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 38 | Mounting and fixing 33 K.V Pin/Disk insulator. |
| 39 | Fixing of Danger board and number plate with clamp . |
| 40 | Wraping of Barbed wire on Pole. |
| 41 | Fixing of 1-ϕ & 3 ϕ distribution box with making proper connection |
| 42 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 43 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 44 | 9 Mtr. long PCC Poles :- |
| 45 | 11 Mtr. long PCC Poles :- |
| 46 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 47 | Installation of VCB in control room & making proper connection. |
| 48 | Grounting of Pcc/ST POLE |
| 49 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 50 | Filling of various type 33/11 kv cable jointing kit. |
| 51 | Installtion of 11 kv TPMO |
| 52 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 53 | Cross Arm holding Clamps with bolts & nuts |
| 54 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 55 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 56 | Clamps for LT T-off with bolts & Nuts |
| 57 | Dead-End Clamp |
| 58 | Clamp with J-Hook |
| 59 | Copper L-Piece 50x225x10 mm |
| 60 | Copper L-Piece 62x225x12 mm |
| 61 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA Transformer. |
| 62 | F-bracket for 33 kV line |
| 63 | Barbed wire GI |
| 64 | LT PVC Cable 3.5x70/35 sq mm |
| 65 | LT PVC Cable 3.5x150/70 sq mm |
| 66 | Al. long leg Barrel, off-size |
| 67 | Danger Board with clamps |
| 68 | Number Plate with clamps |
| 69 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA Transformer. |
| 70 | LT Fuse set with all accecesories |
| 71 | Piercing connector |
| 72 | Nut and bolts |
| 73 | M.S Channel Top |
| 74 | M.S Channel Dropper |
| 75 | M.S Angle 75x75x6x2028mm with clamp & bolt and nut (T/F Base) |
| 76 | M.S channel 125x65x1300mm (T-Off) |
| 77 | M.S Channel |
| 78 | M.S Angle |
| 79 | Aluminium Binding wire |
| 80 | Concreting Of Pole |
| 81 | Concreting Of Stay |
| 82 | Al Leg long barrel off size (LS) |
| 83 | ALL LUG |
| 84 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-Old & Dameged ST Poles |
| 85 | Old and used TF 10 KVA |
| 86 | 11 kv Old and Dameged VCB scrap |
| 87 | Old and Dameged 33 KV control panel |
| 88 | Old and Dameged 33 KV CT |
| 89 | 33 kv Old and Dameged VCB scrap Please Enable Macros to View BoQ information |