| 1 | Safely carriage upto of PCC Pole 11 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 2 | Safely carriage upto of PCC Pole 9 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 3 | Safely carriage upto of PCC Pole 8.5 mtr from PVVNL, Store/ other place/ dump store/33KV S/S Place to site including loading & unloading at both ends. |
| 4 | Safely carriage of line material from PVVNL, Store/other Place/ dump store/ 33 KV S/S place to site including loading & unloading at both ends. |
| 5 | Carriage of 250 KVA T/F From PVVNL, Store/other place/dump store/33 KV S/S Place to site including loading and unloading at both ends. |
| 6 | Safely carriage of 100 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 7 | Safely carriage of 63 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 8 | Safely carriage of 25 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 9 | Safely carriage of 10 KVA T/F from PVVNL, Store/ other Place/ dump store/ 33KV S/S Place to site including loading & unloading at both ends. |
| 10 | Safely Carriage of 11 Kv XLPE Cable 3x70 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
| 11 | Erection of pcc pole 9 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 12 | Erection of pcc pole 11 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 13 | Erection of pcc pole 8.5 mtr support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 14 | Construction of double pole with 9 mtr. PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 15 | Construction of double pole with 11 mtr. PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 16 | Construction of double pole with 8.5 mtr PCC Pole support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting alongwith proper fabrication as per respo norms. |
| 17 | Fixing of stay rod size 16x1800 mm by digging pit and fixing of stay rod & Stringing, nuzzling, binding of stay wire with grouthing ratio 1:4:8 cement, send & brick ballast including linting as per respo norm. |
| 18 | Laying stringing and sagging of ACSR Dog conductor including binding and jumpering as per respo norms. |
| 19 | Laying stringing and sagging of ACSR weasel conductor including binding and jumpering as per respo norms. |
| 20 | Laying stringing and sagging of ACSR rabbit conductor including binding and jumpering as per respo norms. |
| 21 | Providing & Fixing of ST Pole/PCC pole holding clamp with Nut & bolts as per respo norms. |
| 22 | Fixing of disc insulator as per respo norms. |
| 23 | Fixing of pin insulator as per respo norms. |
| 24 | Supply and fixing of dead end clamp with J. Hook as per respo norms. |
| 25 | supply and fixing of suspention clamp with J. Hook as per respo norms. |
| 26 | supply and fixing of piercing connector as per respo norms. |
| 27 | Fixing of LT insulator as per respo norms. |
| 28 | Supply and fixing of Alu. crimpling lugs as per respo norms. |
| 29 | Supply and fixing of Alu. Crimpling lugs for LT distribution box as per respo norms. |
| 30 | Supply and fixing of PG clamp for Areal Bunch Conductor as per respo norms. |
| 31 | Fixing of Top Channel/ Dropper channel/ substation angle, T-off & angle/ channel arm as per Respo norms. |
| 32 | Fixing of cross arm as per Respo norms. |
| 33 | Constrution of PCC/ST pole plinth of size 45x45x30cm in ratio 1:4:8 cement send and concrete as per Respo. |
| 34 | Earthing of pole with help of M.S. Earthing rod as per respo norms. |
| 35 | Making of section of 11 kv line including proper binding and jumpering as per respo norms. |
| 36 | Mounting and installation of 10 KVA T/F on Pole as per respo norms. |
| 37 | Mounting and installation of 25 KVA T/F on D/Pole as per respo norms. |
| 38 | Mounting and installation of 63 KVA T/F on D/Pole as per respo norms. |
| 39 | Mounting and installation of 100 KVA T/F on D/Pole as per respo norms. |
| 40 | Mounting and installation of 250 KVA T/F on D/Pole as per respo norms. |
| 41 | Safly installation of 250 KVA T/F on plinth with porper connection as per respo norms. |
| 42 | Laying of 11 KV XLPE cable 3x70 sqmm. After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 43 | Laying of 11 KV XLPE cable 3x120 sqmm. After digging, trench making & redressing of site alongwith provisioning of material as per norms. |
| 44 | Filling of outdoor type 11 KV cable jointing kit complete in all respect as per RESPO norms. |
| 45 | Filling of indoor type 11 KV cable jointing kit complete in all respect as per RESPO norms. |
| 46 | Laying lifting, stringing and sagging of ABC conductor 3X16+1X35+1x16sqmm as per respo norms. |
| 47 | Laying lifting, stringing and sagging of ABC conductor 3X50+1X35+1x16sqmm as per respo norms. |
| 48 | Laying lifting, stringing and sagging of ABC conductor 3X95+1X50+1X16sqmm as per respo norms. |
| 49 | Laying lifting, stringing and sagging of ABC conductor 3x120+1x95+1x16 sqmm as per respo norms. |
| 50 | Fixing of LT Distribution Box at poles along with clamp as per respo norms. |
| 51 | Neutral/Body earthing of equipment boaring & fixing of 60 ft. deep G.I. Pipe of class 'B' 1.5 dia and connected with G.I. strip of size 30x5 mm including providing required charcoel & salt as per Respo norms. |
| 52 | Providing and Fixing of F Bracket as per Respo Norms |
| 53 | Providing and Fixing of E Bracket as per Respo Norms |
| 54 | Providing and Fixing of Alu. Binding wire as per Respo Norms |
| 55 | Providing and Fixing of G.I. Barbed wire as per Respo Norms |
| 56 | Providing and Fixing of Danger Board with clamp & Bolt & Nuts as per Respo Norms |
| 57 | Providing and Fixing of Number Plate with clamp & Bolt & Nuts as per Respo Norms |
| 58 | fixing of MS channel 100x50mm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 59 | fixing of MS angle 65x65x6 sqmm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 60 | fixing of MS angle 50x50x6 sqmm providing suitable holding clamp with nuts & bolts as per Respo Norms |
| 61 | Laying of LT XLPE cable 3.5x50 sqmm as per Respo Norms |
| 62 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x50 sqmm as per Respo Norms |
| 63 | Laying of LT XLPE cable 3.5x70 sqmm as per Respo Norms |
| 64 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x70 sqmm as per Respo Norms |
| 65 | Laying of LT XLPE cable 3.5x150 sqmm as per Respo Norms |
| 66 | Providing & Fixing of suitable lugs for LT XLPE cable 3.5x150 sqmm as per Respo Norms |
| 67 | Laying of LT XLPE cable 1x120 sqmm as per Respo Norms |
| 68 | Providing & Fixing of suitable lugs for LT XLPE cable1x120 sqmm as per Respo Norms |
| 69 | Fixing of 11 kv fuse set as per Respo Norms |
| 70 | Fixing of 11 kv TPMO as per Respo Norms |
| 71 | Providing & Fixing of single core 1Cx16 sqmm lead for LT distribution Box |
| 72 | Fencing of T/F as per Respo Norms |
| 73 | Construction of plinth 5'x5'x4 for T/F including cost of brick ballast, Ist class Brick , sand, cement, concrete and labour and plastring of plinth 12 mm thick as per respo norms. |
| 74 | Providing & fixing of Double Circuit Tail less unit 300amp. incoming Circuit Connected With Copper Bus Bar of Proper Rating for 250 KVA T/F. in the Frame Made of MS Angle 45x45x5 mm Fitted With G.I. Nut Bolt with proper rating LT copper fuse wire & Fixing the Same Top of Plinth/ Near Ground Level with sutiable XLPE and Lugs as per Site Requirement. |
| 75 | Providing & Fixing of LT Bakelite Fuse Set for 10 KVA & 16 KVA Single Phase Distribution Transformers |
| 76 | Providing & Fixing of LT Fuse Set Installed in SMC Box for 25KVA, 63KVA & 100 KVA Distribution Transformers Please Enable Macros to View BoQ information |