|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | Nut & Bolts |
| 3 | HOLDING CLAMP FOR PCC POLE |
| 4 | X ARM CLAMP FOR PCC POLE WITH N/B |
| 5 | F- CLAMP FOR PCC POLE WITH NUT & BOLT |
| 6 | LT CLAMP FOR PCC POLE WITH N&B |
| 7 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 8 | SHACKLE INSULATOR 75X90 mm WITH NUT BOLT |
| 9 | STAY INSULATOR |
| 10 | AL CRIMPING TYPE LUGS 50 SQ.mm |
| 11 | AL CRIMPING TYPE LUGS 25 SQ.mm |
| 12 | AL. CRIMPING TYPE LUGS 70 SQ.mm |
| 13 | AL. CRIMPING TYPE LUGS 85 SQ.mm |
| 14 | Following work as per UPCL norms & site requirement. |
| 15 | MAKING CABLE TRENCH |
| 16 | ERECTION OF EARTHING ROD |
| 17 | FABRICATION OF STEEL |
| 18 | EXCAVATION OF PIT FOR STAY SET |
| 19 | ERECTION OF LT STAY SET |
| 20 | ERECTION OF 11 KV STAY SET |
| 21 | GROUTING OF STAY SET |
| 22 | EXCAVATION OF PIT FOR POLE |
| 23 | ERECTION OF SINGLE PCC POLE |
| 24 | ERECTION OF SINGLE SP-55 POLE |
| 25 | ERECTION OF PCC DOUBLE POLE |
| 26 | ERECTION OF SP-55 DOUBLE POLE |
| 27 | GROUTING OF POLE |
| 28 | MUFFING OF POLE |
| 29 | INSTALLATION OF HT PRMC |
| 30 | INSTALLATION OF LT PRMC |
| 31 | LAYING OF LT SERVICE CABLE(OVERHEAD) |
| 32 | LAYING OF LT PVC CABLES(UPTO 150 SQMM) |
| 33 | LAYING OF U/G 11 KV CABLE IN TRENCH |
| 34 | INST. OF 100 KVA DTR ON POLE STRUCTUR |
| 35 | INST. OF 63 KVA DTR ON POLE STRUCTURE |
| 36 | INST. OF 25 KVA DTR ON POLE STRUCTURE |
| 37 | FIXING OF FUSE SET |
| 38 | FIXING OF LIGHTNING ARRESTOR |
| 39 | LAYING OF WEASEL CONDUCTOR IN HT LINE |
| 40 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 41 | LAYING OF DOG CONDUCTOR IN HT LINE |
| 42 | LAYING OF 3P 4W LT LINE (WEASEL) |
| 43 | LAYING OF 2P 3W LT LINE (WEASEL) |
| 44 | LAYING OF 1P 2W LT LINE(WEASEL) |
| 45 | GUARDING OF LT/11 KV LINE |
| 46 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 47 | FIXING OF 11 KV XLPE JOINTING KIT |
| 48 | CARTAGE PCC POLE, 21-50 KM |
| 49 | CARTAGE SP-55 POLE, 21-50 KM |
| 50 | CARTAGE OF PETTY MATERIAL,21-50 KM |
| 51 | CARTAGE OF 16/25 KVA DTR, 21-50 KM |
| 52 | CARTAGE OF 63 KVA DTR, 21-50 KM |
| 53 | CARTAGE OF 100 KVA DTR, 21-50 KM |
| 54 | HEADLOAD CARTAGE PCC POLE(0-1 KM) |
| 55 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 56 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 57 | HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM) |
| 58 | HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM) |
| 59 | HEADLOAD CARTAGE OF 100 KVA DTR(0-1 KM) |
| 60 | LOOPING AND CHOPPING OF TREE BRANCHES Please Enable Macros to View BoQ information |