|
| 1 | Dismantling of old damaged/broken single support PCC pole/RS joist/steel tubler pole at site of work including opening of all accessories from the pole. |
| 2 | Carriage of old damaged/broken single support PCC pole/RS joist/steel tubler pole at site of work to JE Store/ESC Saharanpur including loading and unloading at both ends. |
| 3 | Safely Carriage of STP 13 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 4 | Safely Carriage of STP 11 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 5 | Safely Carriage of STP 9 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 6 | Safely Carriage of PCC 11 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 7 | Safely Carriage of PCC 9 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 8 | Safely Carriage of PCC 8.5 mtr. Long from ESC, SRE/JE store to site of work including loading and unloading at both ends. |
| 9 | Erection of STP 13 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 10 | Erection of STP 11 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 11 | Erection of STP 9 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 12 | Erection of PCC 11 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 13 | Erection of PCC 9 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 14 | Erection of PCC 8.5 mtr. support with proper alignment & upto depth of one sixth of length of pole and concreting, grouting along with proper fabrication as per respo norms. |
| 15 | Safely Carriage of line material from PVVNL Store to site of work/JE Store including loading and unloading at both ends. |
| 16 | Providing and fixing of different type MS clamp with nut and bolts as per site requirement. |
| 17 | Providing & Fixing of LT insulator as per site requirement. |
| 18 | Providing & Fixing of nuts & bolt as per site requirement. |
| 19 | For attending Breakdown/fault by sending the crane at Fault site in any emergency case. |
| 20 | Removal of broken/fallen/damage conductor upto dog from site of work including making the roll of conductor. (A) LT line. |
| 21 | (B) HT line |
| 22 | (C) ABC conductor upto 3x120+1x95+1x16 sqmm. |
| 23 | Laying, lifting, stringing, sagging and jointing of upto ACSR dog conductor including complete binding and jumpering after errection of poles. (A) LT line |
| 24 | (B) HT line |
| 25 | (C) ABC conductor. upto 3x120+1x95+1x16 sqmm |
| 26 | Re-sagging of loose existing ACSR old conductor in HT line/LT line including opening of binding and jumpering re-fixing the same after complete of errection work. (A) LT line |
| 27 | (B) HT line |
| 28 | (C) ABC conductor upto 3x120+1x95+1x16 sqmm. |
| 29 | Replacement of broken/damaged disc/pin insulator |
| 30 | Off shooting of tree branches which are touching with 33/11 KV Line by Providing Labour & all Accessories |
| 31 | Removing of fallen tree on existing 33/11 KV Line with the help of crane/labour |
| 32 | Re Erection of tilted/fallen Poles as per proper alignment with the help of crane/labour |
| 33 | Straightening of tilted Pole to Straight Pole as per proper alignment with the help of crane/labour |
| 34 | Digging of trench for tracing of fault by execution of earth remaining the same after removal of fault |
| 35 | Carriage of switch yard Equipment from PVVNL Store to site of work/JE Store including loading and unloading at both ends. |
| 36 | Installation & Replacement of Damaged any switch yard Equipment as per respo norms. Please Enable Macros to View BoQ information |