| 1 | Supply, Installation and Comissioning of Fuel/Oil Purifier Machines as per Technical Specification | Supply, Installation and Comissioning of Fuel/Oil Purifier Machines as per Technical Specification |
| 2 | Hydraulic Oil Purifier Part No:ELC 100LP-Single Phase | Hydraulic Oil Purifier Part No:ELC 100LP-Single Phase |
| 3 | FERROCARE | FERROCARE |
| 4 | Single Phase 230V,50Hz | Single Phase 230V,50Hz |
| 5 | Electrical control panel with digital mA/Kv meter read out separate digital meters for both the HVT's | Electrical control panel with digital mA/Kv meter read out separate digital meters for both the HVT's |
| 6 | Continuous | Continuous |
| 7 | Rubber Hose(5 Mtrs long with y-strainer) with 3/4\\" end fittings both sides (One side QDC type which should match Hydraulic trolley and other end QDC type for Oil purifier machine) | Rubber Hose(5 Mtrs long with y-strainer) with 3/4\\" end fittings both sides (One side QDC type which should match Hydraulic trolley and other end QDC type for Oil purifier machine) |
| 8 | Nylon Hose(5 Mtrs long)with 3/4\\" end fittings both sides (One side QDC type which should match Hydraulic trolley and other end QDC type for Oil purifier machine | Nylon Hose(5 Mtrs long)with 3/4\\" end fittings both sides (One side QDC type which should match Hydraulic trolley and other end QDC type for Oil purifier machine |
| 9 | Adapter/QDC is required to connect both outlet and inlet hose for circulation | Adapter/QDC is required to connect both outlet and inlet hose for circulation |
| 10 | MAKE-KLEENTEK QTY 2 NOS | MAKE-KLEENTEK QTY 2 NOS |
| 11 | 1/2 HP,1PH | 1/2 HP,1PH |
| 12 | MS FABRICATED | MS FABRICATED |
| 13 | 180 Kgs | 180 Kgs |
| 14 | Two Fixed castor Wheels & Two Swivel Wheels | Two Fixed castor Wheels & Two Swivel Wheels |
| 15 | Polyurethene PU Paint | Polyurethene PU Paint |
| 16 | Opline Green | Opline Green |
| 17 | Moisture in oil should not be more than 500PPM | Moisture in oil should not be more than 500PPM |
| 18 | ELC designed to operate for Max. oil temperature upto 60 deg cel | ELC designed to operate for Max. oil temperature upto 60 deg cel |
| 19 | Equipment will be supplied along with 1)Collector papers----2 sets 2)Suction & Delivery hoses 3)Supply Cable 10 mtrs long 4)Oil seal for monblock pump-----1 set 5) Spanner--18/19 -------- 1 no 6)Top cover O-ring ---------------1 no 7)QDC's (Quick Discharge Coupling) as mentioned | Equipment will be supplied along with 1)Collector papers----2 sets 2)Suction & Delivery hoses 3)Supply Cable 10 mtrs long 4)Oil seal for monblock pump-----1 set 5) Spanner--18/19 -------- 1 no 6)Top cover O-ring ---------------1 no 7)QDC's (Quick Discharge Coupling) as mentioned |
| 20 | Operating & Maintenance manual & Warranty certificates,Test Certificate in English Language to be provide along with the consignment. | Operating & Maintenance manual & Warranty certificates,Test Certificate in English Language to be provide along with the consignment. |
| 21 | Equipment should be packed in reusable & transportable packing box | Equipment should be packed in reusable & transportable packing box |
| 22 | Safety Instruction Warning Stickers - For HVT Stickers must be provided on the Unit. | Safety Instruction Warning Stickers - For HVT Stickers must be provided on the Unit. |
| 23 | Physical Checks: a)Visual Check: A)Visual Inspection to check for the colour,welding finishing,damages,if any.B)Check for any loose components.C)Check Name plate on the equipment for details shown below. b) Prove Out Check to be done | Physical Checks: a)Visual Check: A)Visual Inspection to check for the colour,welding finishing,damages,if any.B)Check for any loose components.C)Check Name plate on the equipment for details shown below. b) Prove Out Check to be done |
| 24 | Training shall be provided to HAL Engineers by the supplier at HAL Site. Supplier to provide prior information on his visit to HAL to deliver and offer training | Training shall be provided to HAL Engineers by the supplier at HAL Site. Supplier to provide prior information on his visit to HAL to deliver and offer training |
| 25 | All types of guages to be calibrated & provided with NABL certificate valid for 1 year from supply. | All types of guages to be calibrated & provided with NABL certificate valid for 1 year from supply. |
| 26 | 12 months from the date of installation and commissioning | 12 months from the date of installation and commissioning |