| 1 | Earth work excavation in all classes of soil including narrickal but excluding hard rock which require blasting including back filling in basement & sides of foundation, depositing on bank within an initial lead of 50 m including breaking clods, watering, ramping and sectioning of spoil bank etc. complete up to 1.5 m depth from groung level. |
| 2 | Cement concrete 1:4:8 using 40 mm hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc. complete for foundation leveling course,flooring etc.complete as per deptl:instructions. |
| 3 | RCC work in 1:1.5:3 nominalmix using 20 mm and downgrade hard granite brocken stone including all charges for mixing concrete, laying, consolidating, curing, etc. complete but excluding cost of form work and reinforcement works for foundation footings, bottom & sides of trenches, equipment foundations, colums & beams etc. up to 5 m from ground level. |
| 4 | Providing Steel reinforcement for R.C.C works including all charges for straightening, cutting, bending, placing in position and binding all complete.Above ground level.Thermo Mechanically Treated bars of grade Fe-500D or more. |
| 5 | Centering and shuttering including strutting,propping etc.and removal of form for Foundations, footings, bases of columns, etc. |
| 6 | Supplying, Conveying, fabrication and erection of structural steel work bolted or welded and drilled holes at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIl / RINL / TISCO /JINDAL make) Required gas and electrodes will be supplied free of cost by FACT at stores. |
| 7 | Providing man Mazdoor for labour assistance for emergency works which are not covered in the Schedule of work. Please Enable Macros to View BoQ information |