|
| 1 | fo|qr forj.k [k.M xkSjhcktkj ds {ks=kUrxZr 25 ls 63 ds0oh0,0 ds 10 vn~n ifjorZd {kerko`f} djusa dk dk;ZA |
| 2 | Loading, Unloading and safe carriage, with complete fitting, of 63 KVA T/F from Store Centre, Deoria to work site |
| 3 | Loading, Unloading and safe carriage of 25 KVA T/F from work site to Store Centre, Deoria |
| 4 | Earthing of T/F |
| 5 | Supply of Aluminium Cripling Lug |
| 6 | Supply and Installtion of 11 KV Fuse Set |
| 7 | fo|qr forj.k [k.M xkSjhcktkj ds {ks=kUrxZr 63 ls 100 ds0oh0,0 ds 08 vn~n ifjorZd {kerko`f} djusa dk dk;ZA |
| 8 | Loading, Unloading and safe carriage, with complete fitting, of 100 KVA T/F from Store Centre, Deoria to work site |
| 9 | Loading, Unloading and safe carriage of 63 KVA T/F from work site to Store Centre, Deoria |
| 10 | Earthing of T/F |
| 11 | Supply and Installtion of Aluminium Cripling Lug |
| 12 | Supply and Installtion of 11 KV Fuse Set |
| 13 | fo|qr forj.k [k.M xkSjhcktkj ds {ks=kUrxZr 100 ls 250 ds0oh0,0 ds 09 vn~n ifjorZd {kerko`f} djusa dk dk;ZA |
| 14 | Loading, Unloading and safe carriage, with complete fitting, of 250 KVA T/F from Store Centre, Deoria to work site |
| 15 | Loading, Unloading and safe carriage of 100 KVA T/F from work site to Store Centre, Deoria |
| 16 | Earthing of T/F |
| 17 | Construction of plinth size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days |
| 18 | Pale Fencing |
| 19 | Supply of Aluminium Cripling Lug |
| 20 | Supply of Copper L-piece 50x225x10 mm |
| 21 | Supply of Al Leg Long Barrel Off size |
| 22 | Supply and Installtion of Tailless Unit |
| 23 | fo|qr forj.k [k.M xkSjhcktkj ds {ks=kUrxZr 10 ls 25 ds0oh0,0 ds 11 vn~n ifjorZd {kerko`f} djusa dk dk;ZA |
| 24 | Loading, Unloading and safe carriage of PCC Pole 8.5 Meter Long From Store to Work Site |
| 25 | Loading, Unloading and safe carriage of ACSR Weasel Conductor From Store to Work Site |
| 26 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 27 | Grouting of Pole |
| 28 | Fitting of Earthing set on Pole |
| 29 | Fittiing of Stay |
| 30 | Grouting of Stay |
| 31 | Safe erection, stringing and sagging of ACSR Weasel Conductor, complete in all respects as per site requirement |
| 32 | Loading, Unloading and safe carriage, with complete fitting, of 25 KVA T/F from Store Centre, Deoria to work site |
| 33 | Loading, Unloading and safe carriage of 10 KVA T/F from work site to Store Centre, Deoria |
| 34 | Earthing of T/F |
| 35 | Supply and Installtion of Stone Pad 300x75 mm |
| 36 | Supply and Installtion of Clamp For Top & Dropper Channal |
| 37 | Supply and Installtion of Clamp For Stay |
| 38 | Supply and Installtion of 11 KV Fuse Set |
| 39 | Supply and Installtion of Stay insulator |
| 40 | Supply of Aluminium Cripling Lug |
| 41 | fo|qr forj.k [k.M xkSjhcktkj esa dqy 03 vyx& vyx LFkkuksa ij vfrfjDr 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkukA |
| 42 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 43 | Safe loading, unloading and carriage of ACSR Weasel/Dog Conductor from departmental store to work site |
| 44 | Safe loading, unloading and carriage of LT ABC (3x120+1x95+1x16) sqmm from departmental store to work site |
| 45 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 46 | Safe loading, unloading, carriage of 250 KVA T/F, from departmental store to work site |
| 47 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 48 | Grouting of Pole |
| 49 | Fitting of Earthing set on Pole |
| 50 | Fittiing of Stay |
| 51 | Grouting of Stay |
| 52 | Complete Fitting of MS Top Channel |
| 53 | Complete Fitting of MS Dropper Channel |
| 54 | Work of mounting and installation of 250 KVA distribution transformers. |
| 55 | Fittiing of Earthing set on Transfomer |
| 56 | Construction of plinth size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days |
| 57 | Pale Fancing of Plinth |
| 58 | Work of providing LT connection to the transformer through LT cable. |
| 59 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 60 | Safe erection, stringing and sagging of LT ABC (3x120+1x95+1x16) sqmm, complete in all respects as per site requirement |
| 61 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 62 | Tailless Unit |
| 63 | Stone Pad |
| 64 | Distribution Box |
| 65 | Clamp for Distribution Box |
| 66 | Suspension Clamp |
| 67 | LT Clamp with Nut bolt |
| 68 | Cross Arm Holding Clamp |
| 69 | Clamp for Top & Dropper & T-Off |
| 70 | Clamp for Stay |
| 71 | PG Clamp |
| 72 | Dead End Clamp |
| 73 | Eye Hook |
| 74 | Danger Board with Barbed wire |
| 75 | 11 KV Fuse Set |
| 76 | F Bracket |
| 77 | Copper L-Piece 50x225x10 mm |
| 78 | Alluminium Leg Long Barrel Off size |
| 79 | forj.k [k.M xkSjhcktkj esa dqy 12 LFkkuksa ij vfrfjDr 100 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 80 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 81 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 82 | Safe loading, unloading and carriage of LT ABC (3x95+1x70+1x16) sqmm from departmental store to work site |
| 83 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 84 | Safe loading, unloading, carriage of 100 KVA T/F, from departmental store to work site |
| 85 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 86 | Grouting of Pole |
| 87 | Fitting of Earthing set on Pole |
| 88 | Fittiing of Stay |
| 89 | Grouting of Stay |
| 90 | Work of mounting 100 KVA distribution transformer on double pole |
| 91 | Work of providing LT connection to the transformer through LT cable. |
| 92 | Fittiing of Earthing set on Transfomer |
| 93 | Complete Fitting of MS Top Channel |
| 94 | Complete Fitting of MS Dropper Channel |
| 95 | Complete Fitting of MS Angle (T/F Base) |
| 96 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 97 | Safe erection, stringing and sagging of LT ABC (3x95+1x70+1x16) sqmm, complete in all respects as per site requirement |
| 98 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 99 | Stone Pad |
| 100 | Clamp for Top & Dropper & T-Off |
| 101 | LT Clamp |
| 102 | Danger Board with Barbed wire |
| 103 | 11 KV Fuse Set |
| 104 | Clamp for Stay |
| 105 | Suspension Clamp |
| 106 | Dead End Clamp |
| 107 | Eye Hook |
| 108 | Clamp for Distribution Box |
| 109 | PG Clamp |
| 110 | Cross Arm Holding Clamp |
| 111 | F Bracket |
| 112 | forj.k [k.M xkSjhcktkj esa dqy 07 LFkkuksa ij vfrfjDr 63 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 113 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 114 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 115 | Safe loading, unloading and carriage of LT ABC (3x95+1x70+1x16) sqmm from departmental store to work site |
| 116 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 117 | Safe loading, unloading, carriage of 63 KVA T/F, from departmental store to work site |
| 118 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 119 | Grouting of Pole |
| 120 | Fitting of Earthing set on Pole |
| 121 | Fittiing of Stay |
| 122 | Grouting of Stay |
| 123 | Work of mounting 63 KVA distribution transformer on double pole |
| 124 | Work of providing LT connection to the transformer through LT cable. |
| 125 | Fittiing of Earthing set on Transfomer |
| 126 | Complete Fitting of MS Top Channel |
| 127 | Complete Fitting of MS Dropper Channel |
| 128 | Complete Fitting of MS Angle (T/F Base) |
| 129 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 130 | Safe erection, stringing and sagging of LT ABC (3x95+1x70+1x16) sqmm, complete in all respects as per site requirement |
| 131 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 132 | Stone Pad |
| 133 | Clamp for Top & Dropper & T-Off |
| 134 | LT Clamp |
| 135 | Danger Board with Barbed wire |
| 136 | 11 KV Fuse Set |
| 137 | Clamp for Stay |
| 138 | Suspension Clamp |
| 139 | Dead End Clamp |
| 140 | Eye Hook |
| 141 | Clamp for Distribution Box |
| 142 | PG Clamp Please Enable Macros to View BoQ information |