| 1 | dk;ZA |
| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-11 Mtr. PCC/ST Poles. |
| 3 | 8.5 Mtr. Long PCC Poles. |
| 4 | ACSR Weasel Conductor. |
| 5 | ACSR Dog Conductor. |
| 6 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 7 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 8 | LT AB Cable (3×120+1×95+1×16) sq.mm |
| 9 | T/F 11/0.4 kV, 25 kVA |
| 10 | T/F 11/0.4 kV, 63 kVA |
| 11 | T/F 11/0.4 kV, 100 kVA |
| 12 | T/F 11/0.4 kV, 250 kVA |
| 13 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 14 | 1-ϕ & 3 ϕ distribution box |
| 15 | 11 KV VCB I/C and O/G unit. |
| 16 | 11 KV TPMO |
| 17 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-Old and used TF 10/25/63/100 KVA |
| 18 | 11 KV IN. VCB |
| 19 | 11 KV OG. VCB |
| 20 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel Conductor. |
| 21 | Sagging ACSR Dog Conductor. |
| 22 | Sagging LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 23 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 24 | Sagging LT AB Cable (3×120+1×95+1×16) sq.mm |
| 25 | Fixing of 11 KV Fuse Set . |
| 26 | Mounting and fixing of 25/63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 27 | Making 2x2x1.5 mtr size Plinth for 250 KVA/400KVA transformer with 1 class brick and with all material and civil work as per respo norms. |
| 28 | Installation of 250 KVA/400 KVA transformer on plinth including making proper connections HT/ LT side. |
| 29 | Making MS strip (50x6 mm) Fencing (6 feet height including civil work) for humanand equipment safty with interlocking tile inside transformer fencing. |
| 30 | Water level earthing of 250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 31 | Henly Type Tailless unit protection cubical panel 500A, 650V for 160/250 KVA Transformer. (Tail less unit should be provided by contractor) |
| 32 | Mounting and fixing 11 K.V Stay Set |
| 33 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 34 | Fixing of 1-ϕ & 3 ϕ distribution box with making proper connection |
| 35 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 36 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 37 | 11 Mtr. long PCC Poles :- |
| 38 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 39 | 11 Mtr. long PCC Poles :- |
| 40 | Installation of VCB in control room & making proper connection. |
| 41 | Grounting of Pcc/ST POLE |
| 42 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 43 | Installtion of 11 kv TPMO |
| 44 | LT PVC Cable Al 1x240sq mm |
| 45 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 46 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 47 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 48 | Al. PG clamps Weasel to Weasel |
| 49 | Al. PG clamps Dog to Dog |
| 50 | Suspension Clamp |
| 51 | Dead-End Clamp |
| 52 | Copper L-Piece 50x225x10 mm |
| 53 | Copper L-Piece 62x225x12 mm |
| 54 | LT PVC Cable 3.5x70/35 sq mm |
| 55 | LT PVC Cable 3.5x150/70 sq mm |
| 56 | Al. long leg Barrel, off-size |
| 57 | Danger Board with clamps |
| 58 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA and 400 KVA Transformer. |
| 59 | LT Fuse set with all accecesories |
| 60 | Piercing connector |
| 61 | M.S Channel Top |
| 62 | M.S Channel Dropper |
| 63 | M.S Angle For TF Base |
| 64 | M.S channel T-Off |
| 65 | Concreting Of Pole |
| 66 | Connecting Lead 1x16 sq mm |
| 67 | Clamps for LT T-off with bolts & Nuts Please Enable Macros to View BoQ information |