| 1 | Work of Installation/Replacement of 33KV/11KV/.04KV CT/PT units at 33/11 KV Substations & HV metering connections under EDD-Partapur/Pallavpuram/EDD-Kithore, Meerut. |
| 2 | Safe Carriage of new 33KV/11KV/0.4KV CT/PT unit from store centre,Meerut /JE to site & returned old damage 33KV/11KV/0.4 KV CT/PT unit from site to store centre including the cost of labour for loading &unloading at both ends maximum distance up to 100 Km :- Loading/Unloading and installaion of CT/PT unit by mounting of CT/PT metering unit on the Double Pole Structure and connecting all the connections of HT/LT cable with unit by Connecting clamps of incoming and jumpring of outgoing system with conductor (insulated/bare). cost includes all material (other then CT/PT unit, meter box, insulator, pipe, conductor for jumpering), complete installation on Double Pole structure (with material) if required, T&P, labour etc required for proper complition of work. Note-1- 33KV/11KV/0.4 KV CT/PT unit, meter box, pipe, insulators and conductor(insulated/bare) for jumpering, etc shall be provided by the NIgam/dept. 2- Old damaged CT/PT Unit and other material will be returned back to Store under the supervision of concerned JE in contractor scope.Division Name No of QuantityEDD-Partapur, Meerut. - 25 Nos .EDD-Pallavpuram , Meerut. - 27 Nos.EDD-Kithore, Meerut - 44 Nos. |
| 3 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 4 | 33 KV Lightening arrestor (EDD-Partapur=36, EDD-Kithore=35) |
| 5 | BATTERY CHARGER WITH BATTERY 24 volt (EDD-Partapur=07, EDD-Kithore=05) |
| 6 | Installation of BATTERY CHARGER WITH BATTERY 24 volt (EDD-Partapur=07, EDD-Kithore=05) |
| 7 | Installation of 33 KV Lightening arrestor (as per UPPCL Respo) (EDD-Partapur=36, EDD-Kithore=35) |
| 8 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 9 | (i) Current rating: 1A/5A Site Selectable.(ii) Aux Supply: 180-240V AC +24V DC Rated (As per IEC) with Communicable Port.(iii) Draw Out with CT Shorting.(iv) Front LEDs Display for following:- L1, L2, L3, E, Trip for Faulty Phase/Earth, Low Set Trip, High Set Trip.(v) Relay should have minimum 4 DI, 6 DO.(vii) The relay should have Cold Load pick up, Harmonic Blocking and CBFP. It should have minimum 10 Fault records and 10 Events records.a lp>5 to 400% in step of 1%.b lp>5 to 3000% in step of 1%.c le>5 to 250% in step of 1%.d le>5 to 1500% in step of 1%.e Te>0.02 Sec to 20 sec in step of 0.01 Sec.f Ti>0.02 Sec to 20 sec in step of 0.01 Sec.Note:-Breaker Failure Detectiion.Communication Ports: RS485/RS232.Communication Protocols: MODBUS-RTU&IEC 60870-5-103.Programming through local keypad.Selectable definite Time or IDMT curves as per IEC standards.Rated input current selectable 1A or 5A.Password protection to guard against unauthorized access & editing of setting.Storage of latest 10 fault records with time stamping.Mounting/Case:Draw-out/Non Draw-out.Trip Circuit Supervision through digital input. (EDD-Partapur=20, EDD-Pallvpuram=22, EDD-Kithore=47) |
| 10 | Providing and Commissioning of Master Trip relay in Power T/f at various 33/11 kv Sub station. (EDD-Partapur=20, EDD-Pallavpuram=22, EDD-Kithore=47) |
| 11 | Replacement of defective of WTI in 10/8/5 MVA Power Transformer (as per sample provided by department). (EDD-Partapur=5, EDD-Kithore=5) |
| 12 | Replacement of defective of OTI 10/8/5 MVA Power Transformer (as per sample provided by department). (EDD-Partapur=05, EDD-Kithore=05) Please Enable Macros to View BoQ information |