|
| 1 | Electricity Distribution Division-HARRAIYA, Basti |
| 2 | Safe Loading carrige & Unloading of 6 nos Post Insulator from store to different work site at Village under Harraiya Basti. |
| 3 | Safe Loading carrige & Unloading of 33 KV FUSE SET From Store Centre Basti to Work Site Village under Harraiya Basti. |
| 4 | Loading carrige & Unloding of LT ABC(3X120+1X70+1X16) (Length of 3150 mtr) sqmm from store to Different work site Under Edd Sadar, Basti |
| 5 | Loading carrige & Unloding and Erection of GI Pipe 20 mm For Delta Earthing from store to Different work site Under Edd Sadar, Basti |
| 6 | Loading carrige & Unloding , Erection Along with the Installtion of Distribution Box from store to Different work site Under Edd Sadar, Basti |
| 7 | Loading , Carraige & Unloading, Erection of Various Material like Supsension Clamp, I Hook Clamp, Dead End Clamp, Distribution Box Clamp, PG Clamp, Nut & Bolts, PVC Cable, Neutral Cum Earth Wire & Other Under Edd Sadar, Basti |
| 8 | Loading Unloading & cariage charge of Battery set 3 other places Dubauliya, Harraiya and Makhauda |
| 9 | Deep Bore Pipe Earthing Work on Work Site for Delta Earthing in Various Places under Edd Sadar Basti Under Edd Sadar, Basti |
| 10 | Earthing of Distribution Transfor in Various Places(Polytechnice, Purani Basti, Gidahi ) Under Edd Sadar, Basti |
| 11 | Errection of LT ABC(3X120+1X70+1X16) (Length of 3150 mtr) sqmm at Different Work SiteVillage Under Edd Sadar, Basti |
| 12 | 33 KV fuse set installation charge, Foundation work with material |
| 13 | 33 KV fuse set Jumparing and connection charge |
| 14 | Installation Charge of Battery set 3 other places Dubauliya, Harraiya and Makhauda |
| 15 | 2 nos Fire Extingusher Loading Unloading, Cariage and Installation charge |
| 16 | 2 nos CT, 1 nos PT Loading Unloading & cariage charge basti store to site |
| 17 | 2 nos CT, 1 nos PT Installation Charge at site |
| 18 | 33 KV Isolator Loading Unloading other Material Basti Store to Site |
| 19 | 33 KV Isolator Installation charge, Foundation work with material |
| 20 | 33 KV Isolator Jumparing and connection Charge |
| 21 | Decenterlized Materials |
| 22 | 33 kv fuse set |
| 23 | Battery Set 12 Nos x 2 Volt, 200 Ah |
| 24 | Battery Charger 24 Volt |
| 25 | CO2 Fire Extinguser |
| 26 | Line Isolator 800 A, 33 kv |
| 27 | Nut Bolt |
| 28 | Neutral Cum Earth Wire |
| 29 | Suspension Clamp |
| 30 | I Hook Clamp |
| 31 | Dead End Clamp |
| 32 | Stone Pad |
| 33 | PG Clamp |
| 34 | 10 mm pvc Cable |
| 35 | Distribution Box Clamp isM+ dh Mkfy;ksa ds NVkbZ dk dk;Z Please Enable Macros to View BoQ information |