|
| 1 | Horizontal directional drilling (by trenchless technology) for HDPE/ DWC PE /PVC-O pipe below natural ground level upto all depth including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water & sanitary lines and resistivity test for finding the soil strata using necessary equipments for completion of works, mobilizing of machineries and specialized crew at the job site complete in all respect including cost of entry & exit pits upto depth of 3 meter. Excluding Supply, laying & jointing of all types of pipes. |
| 2 | In all type of soil , Moorum |
| 3 | For upto 100 mm Dia Pipe |
| 4 | For more than 100 mm Dia upto 150 mm Dia Pipe |
| 5 | For more than 150 mm Dia upto 200 mm Dia Pipe |
| 6 | For more than 200 mm Dia upto 250 mm Dia Pipe |
| 7 | For more than 250 mm Dia upto 300 mm Dia Pipe |
| 8 | For more than 300 mm Dia upto 350 mm Dia Pipe |
| 9 | For more than 350 mm Dia upto 400 mm Dia Pipe |
| 10 | For more than 400 mm Dia upto 450 mm Dia Pipe |
| 11 | For more than 450 mm Dia upto 500 mm Dia Pipe |
| 12 | For more than 500 mm Dia upto 550 mm Dia Pipe |
| 13 | For more than 550 mm Dia upto 600 mm Dia Pipe |
| 14 | For more than 600 mm Dia upto 650 mm Dia Pipe |
| 15 | For more than 650 mm Dia upto 700 mm Dia Pipe |
| 16 | For more than 700 mm Dia upto 750 mm Dia Pipe |
| 17 | In Rocks |
| 18 | For upto 100 mm Dia Pipe |
| 19 | For more than 100 mm Dia upto 150 mm Dia Pipe |
| 20 | For more than 150 mm Dia upto 200 mm Dia Pipe |
| 21 | For more than 200 mm Dia upto 250 mm Dia Pipe |
| 22 | For more than 250 mm Dia upto 300 mm Dia Pipe |
| 23 | For more than 300 mm Dia upto 350 mm Dia Pipe |
| 24 | For more than 350 mm Dia upto 400 mm Dia Pipe |
| 25 | For more than 400 mm Dia upto 450 mm Dia Pipe |
| 26 | For more than 450 mm Dia upto 500 mm Dia Pipe |
| 27 | For more than 500 mm Dia upto 550 mm Dia Pipe |
| 28 | For more than 550 mm Dia upto 600 mm Dia Pipe |
| 29 | For more than 600 mm Dia upto 650 mm Dia Pipe |
| 30 | For more than 650 mm Dia upto 700 mm Dia Pipe |
| 31 | For more than 700 mm Dia upto 750 mm Dia Pipe |
| 32 | Extra for excavation of driven pit/ exit pit / intermediate pit beyond 3 meter depth, required for pushing/ pulling of MS/HDPE/RCC etc. pipe in trenchless technology, with proper protection at three sides with shoring sheets/ wooden planks and ISMB's, maintaining during pushing/ puling of pipe, back filling, necessary de-watering including all machinery, tools, and tackles required as per specification and the direction of the Engineer-In-Charge In all type of soil , Moorum |
| 33 | In all type of soil , Moorum |
| 34 | In Rocks |
| 35 | Extra for excavation of driven pit/ exit pit / intermediate pit beyond 3 meter depth, required for pushing/ pulling of MS/HDPE/RCC etc. pipe in trenchless technology, with proper protection at three sides with shoring sheets/ wooden planks and ISMB's, maintaining during pushing/ puling of pipe, back filling, necessary de-watering including all machinery, tools, and tackles required as per specification and the direction of the Engineer-In-Charge |
| 36 | In all type of soil, Moorum, 300 mm to 600 mm |
| 37 | In all type of soil, Moorum, More than 600 mm and upto 900 mm |
| 38 | In all type of soil, Moorum, More than 900 mm and upto 1200 mm |
| 39 | In all type of soil, Moorum, More than 1200 mm and upto 1500 mm |
| 40 | In all type of soil, Moorum,More than 1500 mm and upto 1800 mm |
| 41 | In rock, 300 mm to 600 mm |
| 42 | In rock, More than 600 mm and upto 900 mm |
| 43 | In rock, More than 900 mm and upto 1200 mm |
| 44 | In rock, More than 1200 mm and upto 1500 mm |
| 45 | In rock, More than 1500 mm and upto 1800 mm |
| 46 | Manual Pipe Jacking |
| 47 | Installation of Pipe by Manual Pipe Jacking method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, shoring/strutting, etc., manual shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of pipeline through jacking process from the jacking pit after project completion as per the instructions of the Engineer-in-Charge all complete except the cost of the pipe. (upto 60 meter installation length) |
| 48 | Upto 900 mm dia Manual Pipe Jacking is not permitted for workmen safety reasons |
| 49 | From 900 mm and upto 1000 mm, In all type of Soil |
| 50 | From 900 mm and upto 1000 mm, In rock |
| 51 | Above 1000 mm and upto 1200 mm, In all type of Soil |
| 52 | Above 1000 mm and upto 1200 mm, In rock |
| 53 | Above 1200 mm and upto 1500 mm dia, In all type of Soil |
| 54 | Above 1200 mm and upto 1500 mm dia, In rock |
| 55 | Above 1500 mm and upto 1800 mm mm dia, In all type of Soil |
| 56 | Above 1500 mm and upto 1800 mm mm dia, In rock |
| 57 | Above 1800 mm and upto 2200 mm mm dia, In all type of Soil |
| 58 | Above 1800 mm and upto 2200 mm mm dia, In rock |
| 59 | Above 2200 mm and upto 2600 mm mm dia, In all type of Soil |
| 60 | Above 2200 mm and upto 2600 mm mm dia, In rock |
| 61 | Micro tunneling |
| 62 | Upto 300 mm outer dia, All type of soil |
| 63 | Upto 300 mm outer dia, Rocks |
| 64 | Above 300 mm and upto 450 mm dia, All type of soil |
| 65 | Above 300 mm and upto 450 mm dia, Rocks |
| 66 | Above 450 mm and upto 600 mm dia, All type of soil |
| 67 | Above 450 mm and upto 600 mm dia, Rocks |
| 68 | Above 600 mm and upto 900 mm dia, All type of soil |
| 69 | Above 600 mm and upto 900 mm dia, Rocks |
| 70 | Above 900 mm and upto 1200 mm OD, All type of soil |
| 71 | Above 900 mm and upto 1200 mm OD, Rocks |
| 72 | Above 1200 mm and upto 1500 mm OD, All type of soil |
| 73 | Above 1200 mm and upto 1500 mm OD, Rocks |
| 74 | Above 1500 mm and upto 1800 mm OD, All type of soil |
| 75 | Above 1500 mm and upto 1800 mm OD, Rocks |
| 76 | Above 1800 mm and upto 2100 mm OD, All type of soil |
| 77 | Above 1800 mm and upto 2100 mm OD, Rocks |
| 78 | Above 2100 mm and upto 2400 mm OD, All type of soil |
| 79 | Above 2100 mm and upto 2400 mm OD, Rocks |
| 80 | Static Pipe Bursting |
| 81 | Replacement of pipelines (internal diamter) through Static Pipe Bursting process including making of bursting tool entry pits, all related civil works for site preparation, like excavation, shoring/strutting, maintaining the pits, traffic management etc., flow stoppage by the appropriate stanking methods, bypass pumping, installing the replacement pipe, restoring the manhole after replacement pipe installation etc., completion and service reconnection as per the instructions of the Engineer-in- Charge, as per IndSTT 301-2022 Code of Practice for Pipe Bursting Technique Suiting Indian Conditions. |
| 82 | upto 150 mm |
| 83 | From 150 mm to 200 mm |
| 84 | From 200 mm to 250 mm |
| 85 | From 250 mm to 300 mm |
| 86 | From 300 mm to 375 mm |
| 87 | From 375 mm to 450mm |
| 88 | From 450 mm to 500 mm Please Enable Macros to View BoQ information |