| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-11 Mtr. PCC/ST Poles. |
| 3 | 8.5 Mtr. Long PCC Poles. |
| 4 | ACSR Weasel Conductor. |
| 5 | ACSR Rabbit Conductor. |
| 6 | ACSR Dog Conductor. |
| 7 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 8 | LT AB Cable (3×120+1×95+1×16) sq.mm |
| 9 | T/F 11/0.4 kV, 250 kVA |
| 10 | 11 KV XLPE Cable AL. 3x70 sq.mm |
| 11 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 12 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 13 | 1-ϕ & 3 ϕ distribution box |
| 14 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 15 | 11 KV VCB I/C and O/G unit. |
| 16 | 11 KV TPMO |
| 17 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-Old and used TF 10/25/63/100 KVA |
| 18 | 33 KV CT |
| 19 | 33 KV PT |
| 20 | 11 KV IN. VCB |
| 21 | 11 KV OG. VCB |
| 22 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel Conductor. |
| 23 | Sagging ACSR Rabbit Conductor. |
| 24 | Sagging ACSR Dog Conductor. |
| 25 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 26 | Sagging LT AB Cable (3×120+1×95+1×16) sq.mm |
| 27 | Digging of cable trench in size of 0.45Mtr. x1.05 Mtr. and Laying cable in trench and Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other and:-11 KV XLPE Cable AL. 3x70 sq.mm |
| 28 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 29 | Cable laying by Digging and drilling of Various type 33KV /11 KV and LT XLPE cable trench less (HDD Method) |
| 30 | Cable laying by sand and bricks of Various type 33KV /11 KV XLPE cable. |
| 31 | G.I. Pipe 6” dia for inserting 33/11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 32 | Fixing of 11 KV Fuse Set . |
| 33 | Mounting and fixing of 33 KV CT and PT on double pole including making proper connections. |
| 34 | Installation of 250 KVA/400 KVA transformer on plinth including making proper connections HT/ LT side. |
| 35 | Making MS strip (50x6 mm) Fencing (6 feet height including civil work) for humanand equipment safty with interlocking tile inside transformer fencing. |
| 36 | Water level earthing of 250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 37 | Henly Type Tailless unit protection cubical panel 500A, 650V for 160/250 KVA Transformer. (Tail less unit should be provided by contractor) |
| 38 | Mounting and fixing 11 K.V Stay Set |
| 39 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 40 | Fixing of Danger board and number plate with clamp . |
| 41 | Wraping of Barbed wire on Pole. |
| 42 | Fixing of 1-ϕ & 3 ϕ distribution box with making proper connection |
| 43 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 44 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 45 | 11 Mtr. long PCC Poles :- |
| 46 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 47 | 11 Mtr. long PCC Poles :- |
| 48 | Installation of VCB in control room & making proper connection. |
| 49 | Grounting of Pcc/ST POLE |
| 50 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 51 | Filling of various type 33/11 kv cable jointing kit. |
| 52 | Installtion of 11 kv TPMO |
| 53 | LT PVC Cable Al 1x240sq mm |
| 54 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 55 | Cross Arm holding Clamps with bolts & nuts |
| 56 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 57 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 58 | Al. PG clamps Rabbit to Rabbit |
| 59 | Al. PG clamps Dog to Dog |
| 60 | Suspension Clamp |
| 61 | Dead-End Clamp |
| 62 | Copper L-Piece 50x225x10 mm |
| 63 | Copper L-Piece 62x225x12 mm |
| 64 | F-bracket for 11 kV line |
| 65 | Barbed wire GI |
| 66 | Al. long leg Barrel, off-size |
| 67 | Danger Board with clamps |
| 68 | Number Plate with clamps |
| 69 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA and 400 KVA Transformer. |
| 70 | Piercing connector |
| 71 | Nut and bolts |
| 72 | M.S Channel Top |
| 73 | M.S Channel Dropper |
| 74 | M.S Angle |
| 75 | M.S Bracing Angle |
| 76 | M.S channel T-Off |
| 77 | Connecting Lead 1x16 sq mm |
| 78 | Clamps for LT T-off with bolts & Nuts |
| 79 | F CLAMP |
| 80 | clamps with nuts and bolts |
| 81 | DP Holding Clamp |
| 82 | GI WIRE 6 SWG |
| 83 | GI WIRE 8 SWG Please Enable Macros to View BoQ information |