|
| 1 | dk;ZA |
| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-11 Mtr. PCC/ST Poles. |
| 3 | 8.5 Mtr. Long PCC Poles. |
| 4 | ACSR Weasel/Rabbit Conductor. |
| 5 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 6 | T/F 11/0.4 kV, 100 kVA |
| 7 | T/F 11/0.4 kV, 250 kVA |
| 8 | LT PVC cable (3.5X150/70) sqmm |
| 9 | LT PVC cable (1X400) sqmm |
| 10 | 11 KV XLPE Cable AL. 3x70 sq.mm |
| 11 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 12 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 13 | 11 KV Cable Box |
| 14 | 11 KV VCB I/C and O/G unit. |
| 15 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-AB cable from line, making bundle and stacking at a safe place, |
| 16 | ACSR conductor from all phases on line, making bundle and stacking at a safe place, |
| 17 | 33 KV CT/PT Unit |
| 18 | Old and used TF 10/25/63/100 KVA |
| 19 | WTI/OTI |
| 20 | Battery set |
| 21 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel/Rabbit/Dog Conductor. |
| 22 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 23 | Sagging Various type 11/33 KV XLPE Cable over head |
| 24 | Cable laying by sand and bricks of Various type 33KV /11 KV XLPE cable. |
| 25 | G.I. Pipe 6” dia for inserting 33/11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 26 | Fixing of 11 KV Fuse Set . |
| 27 | Mounting and fixing of 33 KV CT as per respo norms. |
| 28 | Mounting and fixing of 33 KV PT as per respo norms. |
| 29 | Mounting and fixing of 25/63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 30 | Mounting and fixing of 100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 31 | Making 2x2x1.5 mtr size Plinth for 250 KVA/400KVA transformer with 1 class brick and with all material and civil work as per respo norms. |
| 32 | Removing above 100 kva transformer from plinth |
| 33 | Installation of 250 KVA/400 KVA transformer on plinth including making proper connections HT/ LT side. |
| 34 | Making MS strip (50x6 mm) Fencing (6 feet height including civil work) for humanand equipment safty with interlocking tile inside transformer fencing. |
| 35 | Water level earthing of VCB/250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 36 | Henly Type Tailless unit protection cubical panel 500A, 650V for 160/250 KVA Transformer. (Tail less unit should be provided by contractor) |
| 37 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 38 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 39 | Mounting and fixing 33 K.V Pin/Disk insulator. |
| 40 | Fixing of Danger board and number plate with clamp . |
| 41 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 42 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 43 | 11 Mtr. long PCC Poles :- |
| 44 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 45 | 11 Mtr. long PCC Poles :- |
| 46 | Installation of VCB in control room & making proper connection. |
| 47 | Grounting of Pcc/ST POLE |
| 48 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 49 | Filling of various type 33/11 kv cable jointing kit. |
| 50 | Installtion of 11 kv TPMO |
| 51 | Installtion of Bettery Set |
| 52 | Installtion of WTI/OTI |
| 53 | Fixing of Dead and Clamp |
| 54 | Fixing of Sespension Clamp |
| 55 | Fixing of Stay Insulator |
| 56 | Opening of Damage WTI/OTI Connections as respo norms. |
| 57 | Fixing of Copper L Piece (62x225x12 (LS) |
| 58 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 59 | Suspension Clamp |
| 60 | Dead-End Clamp |
| 61 | Eye-Hook |
| 62 | J-Hook |
| 63 | Copper L-Piece 50x225x10 mm |
| 64 | Al. long leg Barrel, off-size |
| 65 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA and 400 KVA Transformer. |
| 66 | LT Fuse set with all accecesories |
| 67 | Double pole clamp |
| 68 | Stay rod clamp |
| 69 | Stay insulator |
| 70 | Nut and bolts |
| 71 | M.S Channel Top & Dropper and T-off |
| 72 | Grouting Meterial |
| 73 | F Clamp |
| 74 | WTI/OTI |
| 75 | GI PIPE 6 inch Diameter |
| 76 | M.S Angle For TF Base Please Enable Macros to View BoQ information |