| 1 | Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. |
| 2 | PCC Pole 11 mtr long |
| 3 | PCC Pole 8.5 mtr long |
| 4 | 11 KV VCB Outgoing 200/100/5A |
| 5 | 11 KV XLPE Cable AL 3x185 sqmm (Double Circuit) |
| 6 | JOINTING KIT 3x185mm |
| 7 | 11 KV Cross ARM\\"V\\" Type |
| 8 | 11 KV Disc Insulator With Fitting |
| 9 | 11 KV Pin Insulator |
| 10 | ACSR Rabbit Conductor |
| 11 | G.I Barbed Wire |
| 12 | LT ABC CABLE (3X50+1x35+1x16) |
| 13 | LT ABC CABLE (3X95+1x70+1x16) |
| 14 | LT ABC CABLE (3X120+1x95+1x16) |
| 15 | Distribution Box 3 Phase |
| 16 | Stay Set Complete |
| 17 | Earthing Set Complete |
| 18 | Errection PCC pole 8.5 mtr/ 11 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) of the pole with proper ramming after completion of work (as per UPPCL Respo). |
| 19 | Errection of Double PCC Pole 8.5/ 11 mtr mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of Soil for each pole including grouting ratio (1:4:8) of the pole with proper ramming after completion of work (as per UPPCL Respo).) |
| 20 | Installation and commissining 11 KV OUTGOING VCB 200/100/5A |
| 21 | Laying of 11 KV XPLE Cable 3*185 sqmm pit of the size 1.5 in the trunch and roas crossing in the air. (as per UPPCL Respo) |
| 22 | Making Of Tranch For 11 KV XLPE Cable With Brick And Send |
| 23 | Filling of Joint Kit 11 KV XPLE Cable 3*120 sqmm (as per UPPCL Respo). |
| 24 | Errection of Double pole Stracture (As per Ane-15) |
| 25 | Fixing of 11 KV X-ARM (as per UPPCL Respo). |
| 26 | Fixing of 11 KV Disc Insulator (as per UPPCL Respo). |
| 27 | Fixing of 11 KV Pin Insulator (as per UPPCL Respo). |
| 28 | Laying, lifting, Stringing & Proper sagging of ACSR RABBIT CONDUCTOR For HT/LT Line including binding & junpering properly. (as per UPPCL Respo) |
| 29 | fixing of G.I Barbed Wire (as per UPPCL Respo). |
| 30 | Fixing of Stay rod complete as per norms (as per UPPCL Respo). |
| 31 | Fixing of MS Earthing of each 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo). |
| 32 | Provinding And Fixing of Stone pad ( as per Direction of supervixing Engineer) |
| 33 | Providing and Fixing F-Clamp with nut and bolt ( as per Direction of supervixing Engineer) |
| 34 | Providing and Fixing number plate ( as per Direction of supervixing Engineer) |
| 35 | Providing and Fixing Danger Board with clamp ( as per Direction of supervixing Engineer) |
| 36 | Excavation of Trunch (Kaccha Road) for Cable (as per UPPCL Respo). |
| 37 | Laying of LT ABC 3*50 sqmm including fixing of all LT ABC assesories on support (as per UPPCL Respo) |
| 38 | Laying of LT ABC 3*95 sqmm including fixing of all LT ABC assesories on support (as per UPPCL Respo) |
| 39 | Laying of LT ABC 3*120 sqmm including fixing of all LT ABC assesories on support (as per UPPCL Respo) |
| 40 | Fixing of Distribution Box as per norms (as per UPPCL Respo). |
| 41 | Providing and Fixing of Holding Clamp ( as per Direction of supervixing Engineer) |
| 42 | Providing and Fixing of Distribution Box Clamp ( as per Direction of supervixing Engineer) |
| 43 | Providing and Fixing of Suspension Clamp ( as per Direction of supervixing Engineer) |
| 44 | Providing and Fixing of Dead & Clamp ( as per Direction of supervixing Engineer) |
| 45 | Providing and Fixing J-Hook ( as per Direction of supervixing Engineer) Please Enable Macros to View BoQ information |