|
| 1 | Safe cartage of centralised Material from central store to Work Site (Including Loading, Unloading in all Respect) |
| 2 | PCC Pole of 8.5/9 Mtr. |
| 3 | PCC Pole of 11 Mtr. |
| 4 | 250 KVA Transformer |
| 5 | Centeral Material |
| 6 | LT AB Cable(3x50+1x35+1x16) SQ MM |
| 7 | Construction of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth) |
| 8 | Installation of 250 KVA T/F on Plinth in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor) |
| 9 | Digging and Erection 8.5/9 Mtr PCC pole with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item As Clamp,Nut bolt Angel, Chanal etc will be provide by Contractor) |
| 10 | Digging and Erection 11 Mtr PCC pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item As Clamp,Nut bolt Angel, Chanal etc will be provide by Contractor) |
| 11 | Dismantling STP/PCC Pole Charges |
| 12 | Open Jar Jar Rabit/ Weasal/ABC from Pole, Lay down and collect safly |
| 13 | Work of Spread ABC, mounting and tying the wire on the pole with installation of all necessary line Item properly as RESPO Norms. (Decentralized Item As Nut Bolt, ALL Type Clamp, J huk, Angel will be provide by Contractor) |
| 14 | Work for Laying of 11KV XLPE cable as RESPO Norms(Decentralized Item as Bricks, Sand etc will be provided by Contractor) |
| 15 | Work for Laying of 11KV XLPE cable After digging tranch RESPO Norms(Decentralized Item as Bricks, Sand etc will be provided by Contractor) |
| 16 | Providing and Fixing GI Pipe 6\\" Dia and Pass XLPE Cable through it. |
| 17 | Work For Installation of Indoor/Outdoor Cable Jointing Kits as RESPO Norms on 11 kV XLPE Cable(Decentralised Item provided by Contrector) |
| 18 | Installation of 3 Phase Distribution Box (Decentralized Item will be provide by Contractor) |
| 19 | Safly Cartage of 11 KV (O/G, I/C VCB) and Control Panel from Centeral Store to 33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 20 | Safly Cartage of 33KV VCB from Centeral Store to 33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 21 | Safly Cartage of 33KV CT from Centeral Store to 33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane. |
| 22 | Dismentling of old 11KV & 33 KV VCB/Controle Panal from the control room/Switch Yard including opening of all H.T. cable/ bus-bar form VCB and carriage VCB out Side Control Room/Switch Yard |
| 23 | Shifting of New 11KV VCB/Control Panal from out side to inside the control room with the help of heavy duty crene and its instalation with grouting with anchor bolts. |
| 24 | Shifting of New CT from out side to inside the Switch Yard with the help of heavy duty crene and its Properly instalation Work. |
| 25 | Preparing Structure in Switch Yard of Sub Station for CT/ 33 KV VCB (All Decentralized Item will be provide by Contractor) |
| 26 | Shifting of New 33 KV VCB from out side to inside the Switch Yard with the help of heavy duty crene and itsinstalation Work. |
| 27 | Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of 33KV & 11 KV VCB etc, completely in all respect. |
| 28 | Making the connection of 33KV VCB and Control Panel completely in all respect.(All required Decentralized material will be Provided by contractor) |
| 29 | Providing and Fixing 4x25 mm2 Control Cable in Double Circt Control Panel |
| 30 | Providing and Fixing 2x25 mm2 Control Cable in Double Circt Control Panel |
| 31 | Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing) |
| 32 | According RESPO Norms Installation of danger board on pole(All required Decentralized material will be Provided by contractor) |
| 33 | According RESPO Norms Installation of barbed wire on pole(All required Decentralized material will be Provided by contractor) |
| 34 | According RESPO Norms Instalation 11 KV Fuse Set (All required Decentralized material as Nut bolt, Clamp, Chanal will be Provided by contractor for Fuse Set) |
| 35 | According RESPO Norms Instalation LT Fuse Set (All required Decentralized material as Nut bolt, Clamp etc will be Provided by contractor for Fuse Set) |
| 36 | According RESPO Norms Wire Mesh Fencing size of 2x2x1.5 for Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing) |
| 37 | According RESPO Norms for Safty of 250KVA T/F Instalation of Tell Less Unit with Structure In LT Side of T/F.(All required Decentralized material will be Provided by contractor for Tell Less Unit) |
| 38 | According RESPO Norms Earthing of Pole by MS earthing |
| 39 | Received Back Old/Damaged Material from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 40 | 100 KVA TF |
| 41 | 33KV/11 VCB/Control Panel |
| 42 | Receive Back of ABC |
| 43 | 33KV CT Please Enable Macros to View BoQ information |