| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: Superintending Engineer, Electricity Construction & Work Circle-II, P.V.V.N.L., Meerut Bought Out Name of Work: Work for Increasing Capacity of 33/11 KV Substation Sherkot (2x5 to 10+5MVA) 33/11 KV Substation Nagina Dehat (2x5+8 to 10+8+5MVA), 33/11 KV Substation Raipur (10+5 to 2x10MVA), District-Bijnor Direct Tender Reference No : 22/ECWC-II/MRT/2026-27 Quote for Supply Portion only Bidder Name : Quote for Erection Portion only PRICE BID1. This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns after validating the sheet, else the bidder is liable to be rejected for this tender.2. Bidders are allowed to enter the Bidder Name and Unit Ex-Works Price and GST in %age only.3. All the material and erection practices shall be as per tender specification.5. Above Schedule Structure and quantities is provisional and may vary as per site requirement with due approval.6. Indicative scope of works and quantity of Items/Materials required for above work shall be as per the Price Bid. Any other material if required to complete the job and not mentioned above, shall have to be provided by the bidder without additional cost.7. Financial evaluation and selection of 'L1 Bidder' shall be done on the basis of total amount. The rates received in the tender will be final after the approval of the Competent Authority/Committee and the competent Authority/committee will have the right to negotiate in tender rate/amount.8. The work (i.e. shifting and erection/installation etc.) of new 10/20 MVA transformer(s) is under the scope of manufacturing/supplier firm as per the L.No. 2040/PVVNL-MT/MM/22-23, Dated 10.06.2022 of S.E. (MM-1), PVVNL, Meerut. The quoted rates by bidder for this item will be applicable only if this work is not carried out by the manufacturing/supplier firm for any reason.9. Tenderer must be fill-up the enclosed terms & conditions sheet and attached with 1st Part of Tender as well as scanned copy of same will be uploaded on NIC Website alongwith other documents.10. Bidders must be filled up the GST in %age, Otherwise it is assumed G.S.T. rates are included in the given ex-works price (Rs./Unit). NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Works Item Code Tender Qty. Unit Estimated Rate Bought-out/Direct Specify Bought-out/Direct Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Ex-Works Price(Rs./unit) Excise Duty(Rs/Unit) CST/VAT(Rs/Unit) Other Taxes & Duties(Rs/Unit) Freight & Insurance Charges(in Rs./Unit) Unit FOR Dest. Supply Price incl. all Taxes and Duties(in Rs./Unit)(F+G+H+I+J) Total Value for Supply or Erection (In Rs.)(C x F) GST (in Rs.) in %age Total Value for GST (in Rs.) (F*M/100) Total Unit Price incl. GST (in Rs.) Total Amount excl. GST (in Rs.) (4×13) Total Amount incl. GST (in Rs.) (4×26) TOTAL AMOUNT In Words |
| 2 | Supply by Contractor :- (Items provided as per GTP/Resspo Drawing) for Item No. 1 to 09Al. P.G. Clamp Dog to Dog/Panther to Dog as required. |
| 3 | 2x2.5sqmm Control Cable (armoured) |
| 4 | 4x2.5sqmm Control Cable (armoured) |
| 5 | GalvanisedStructure of P.T (125x65x6 & 75x75x6mm) |
| 6 | M.S Round 32mm Dia |
| 7 | GI Nut & Bolts with washer |
| 8 | G.I Pipe 150 mm Dia, 3 mtr long |
| 9 | 33KV CT/PT Junction Box as required. |
| 10 | Holding Clamp for GI Pipe |
| 11 | Loading, Safe carriage & unloading of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively. (for Item No. 10 to 16)11KV 3x300 mm2 XLPE Al. Cable |
| 12 | Lightning Arrestor 33 KV |
| 13 | 33 KV Fuse Set |
| 14 | 33 KV PT (outdoor) 33 KV/110 V) |
| 15 | 33 KV VCB, 800, 750 MVA |
| 16 | Various Type of Jointing Kit (indoor/outdoor) |
| 17 | 33 KV Post Insulator |
| 18 | Renovation/Repairing of old T/F Plinth |
| 19 | Painting of StructuresPainting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. Terminal Gantry/Bus Bar Gantry/Line Isolator/Bus Isolator/Post Insulator/Fuse Set/C.T.s/P.T.s/L.A.'s structures etc.( All material provided by contractor ) |
| 20 | Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation , 63 KVA, 3 Phase D/G Set for testing of TF & equipments installed at Substation to complete the job satisfactorily. |
| 21 | Removal of existing 5/8MVA Transformer and other accessories equipments.Disconnecting HT cable connection from 33KV side & 11KV side of 05/8 MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame, Neutral structure, earthing strip etc. |
| 22 | Draining of transformer oil from conservator, radiators of existing 05/08 MVA T/F in to the dry & clean drum (Empty drums shall be provided by contractor) & Removal of conservator, radiators and other accessories from existing 05/08 MVA Power transformer |
| 23 | Safe Shifting of 05/8 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution). |
| 24 | Re-assembling of conservator, radiators and other accessories to existing 05/08 MVA Power transformer & Re-filling the transformer oil (old & used in existing 5/8MVA T/F) |
| 25 | Boring and lowering of G.I. Pipe size 40 mm dia. into the ground up to water level or minimum 20 mtr with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the neutral bushing where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support. All marerials and T&P will be provided contractor to complete the job at his own cost. |
| 26 | Providing,Fabrication and erection of neutral earthing L Type support made of size 100×50mm. Structure shall be 5.3 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminum paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, GI Bolt and washer. Including Providing of GI Channal (125x65x6, 100x50x6), GI Angle (65x65x6), Earthing Strip (50x6), Copper bond, GI Nuts bolts & Providing other accessories if required. |
| 27 | Providing,Fabrication and erection of cable support made of two pieces of GI. Channel (100×50×6) mm, 3.75 meter long, joined to each other by means of 5 Nos. GI. Flat (50×6)mm pieces of size 600 mm long each by welding at equal intervals and grouting in a block of size (300×300×700)mm in CC 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. GI clamps made of (50×6)mm M.S. Flat for holding the cable including nuts and bolts. Including Providing of GI Channal (125x65x6, 100x50x6), GI Angle (65x65x6), Earthing Strip (50x6), Copper bond, GI Nuts bolts & Providing other accessories it required. |
| 28 | Providing,Fabrication and grouting of GI. frames 4.60 mtr. long for support of copper Bus Bar. Bus Bar will be provided in L.V. Side of Power transformer. The GI. frame shall be made of GI. channel (100×50)mm in 'T' shape. Providing 2 Nos. support of GI. Angle iron (50×50×6)mm, 0.60 mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator/post Insulator. The work also includes the fixing of 3 Nos. 11 KV pin/post insulator with pin and binding the copper Bus Bar with the pin/post insulator by Aluminum binding wire in complete. Including Providing of GI Channal (125x65x6, 100x50x6), GI Angle (65x65x6), Earthing Strip (50x6), Copper bond, GI Nuts bolts & Providing other accessories it required. |
| 29 | Providing & Fixing of copper bus bar size (2500x75x8)mm for transformer & cable Connection with providing empire tape and HT Tape for proper insulation work (approx 2 Mtr each) |
| 30 | H.T. Power Cable Laying :Laying 11 KV, (3×300) mm2/(3×185)mm2 XLPE, Cable from power transformer to 11 KV Incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). Making of Chulla for safely laying of cable at incoming switchgear end. The cable shall be duly protected by brick. On both side of cable by laying brick vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. of bricks are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6m ring at both ends. |
| 31 | Laying and dressing of 11 KV 3×300 mm2/3×185 mm2 power cable in air/Trench. |
| 32 | Preparation of 11 KV Power Cable ends :Making of 33/11 KV XLPE Heat shrinkable out door jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs. |
| 33 | Making of 11 KV /33KV XLPE heat shrinkable indoor jointing kits in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with J/Kit boxes. Fixing and insulating of lugs on cable with switch gear complete in all respect. |
| 34 | Fixing of PG clamps duly casted made of aluminum alloy complete with G.I. Nut, bolts, washers and spring washers suitable for ACSR Dog/panther Conductor |
| 35 | wearing of 150 mm dia 3 mtr. long G.I. pipe in the feeder cable of size of (3×300)mm2/(3×185)mm2 XLPE power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe is to be buried in to the ground about ½ m and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections including supply of cable mounting clampls etc. |
| 36 | Control Cable Laying : Laying of different size of (2×2.5)mm2 Copper control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT's to CT's Junction Box, CT 33 KV, 33 KV P.T, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. |
| 37 | Laying of different size of (4×2.5)mm2 Copper control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT's to CT's Junction Box, CT 33 KV, 33 KV P.T, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. |
| 38 | Construction of Control Cable Trench of size 30cmx30cm with Trench wall thickness 23cm with trench covers as per Resspo norms Including providing GI Strip 25x3 for control cable laying |
| 39 | Construction of SSO Approach Road (as per Specification) |
| 40 | Excavation of Earth, Erection of Structure 33 KV Lightening Arrestor, Grouting and Plinthing of completed Structure with fabrication work, MS Earthing Strip (50x6), Copper bond, GI Nuts bolts & Providing other accessories if required. |
| 41 | Outdoor switchyard Earthing with 32 mm.size MS round Earth mat with Delta Earthing on power Transformer Neutral & 33 KV LA as per Resspo specification. |
| 42 | Providing assistance for Testing & commissiong of TF/Substaion |
| 43 | Sundries item |
| 44 | Earthing of L.A's & Transformer neutral : Making of delta with. 32mm dia M.S. round bar electrode and Fabrication of 32 mm dia bar for 3.0 m long electrodes and digging them into ground so that the top of M.S. Round/Electrode remains at least 0.75m in air and jointing of earth electrode with the delta by using 75mm long piece of M.S. Round using high quality Arc welding and paints of joints with black bituminious paint by providing MS round 32mm dia and all required material. |
| 45 | Making earthing of all 33 KV panels, 11KV Switchgears inside the control room and all other outdoor equipments on both earth terminal by providing G.I.Strip in size 50x6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding, as per PVVNL guidline. |
| 46 | Installation & mounting of materials on erected structure (The Work also includes safe removal of old items present in acquired land)Mounting of 33KV L.A |
| 47 | Mounting of 33KV PT |
| 48 | Mounting of 33KV Post Insulator |
| 49 | Mounting of 33KV Fuse Set |
| 50 | Hight Increasing of LA Structure |
| 51 | Rubber Mat 1Mtrx2Mtr thikness 20mm, (Supply & Fixing) Total in Figures 0.0 0.0 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words Zero Only Please Enable Macros to View BoQ information |