|
| 1 | Supply of following materials:- Lilo line of 33 Kv 33 Kv Sikhar to Mediya feeder emanating from 132/33 Kv S/S Kachhawa , Mirzapur the works site as per RESSPO norms. (Provided by Contractor) |
| 2 | E Bracket for 33 kv |
| 3 | F-bracket for 33 KV |
| 4 | Bolts, Nuts & Washers |
| 5 | PG Clamp |
| 6 | Structure for Line Isolator |
| 7 | T-Off Channel |
| 8 | Dropper channel for DP |
| 9 | Stay clamp ( Market rate) |
| 10 | Top channel clamp for pcc pole |
| 11 | Bracing Angle Clamp |
| 12 | X- Arm holding clamp |
| 13 | 33 Kv stay loop insulator |
| 14 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 15 | Pcc pole 9.0 mtr long |
| 16 | Pcc pole 11.0 m long |
| 17 | S.T. Pole 11.0 m long |
| 18 | 33 Kv V-Type steel cross arm |
| 19 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 20 | Top channel 125x65mm 3200 mm (10.70 kg/m) |
| 21 | Polymeric Disc insulator 70 KN (B&S type) |
| 22 | Disc fitting 70KN |
| 23 | ACSR Dog conductor |
| 24 | Polymeric 33 kv Pin insulater |
| 25 | Complete stay set |
| 26 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 27 | 33 KV Cable Al 3x300 sq mm XLPE |
| 28 | 33 KV Cable J/Kit (3x300 Sq mm) |
| 29 | 33 KV Line isolator |
| 30 | ERECTION OF WORK |
| 31 | E Bracket for 33 kv |
| 32 | F-bracket for 33 KV |
| 33 | Bolts, Nuts & Washers |
| 34 | PG Clamp |
| 35 | Structure for Line Isolator |
| 36 | T-Off Channel |
| 37 | Dropper channel for DP |
| 38 | Stay clamp ( Market rate) |
| 39 | Top channel clamp for pcc pole |
| 40 | Bracing Angle Clamp |
| 41 | X- Arm holding clamp |
| 42 | 33 Kv stay loop insulator |
| 43 | Pcc pole 9.0 mtr long |
| 44 | Pcc pole 11.0 m long |
| 45 | S.T. Pole 11.0 m long |
| 46 | 33 Kv V-Type steel cross arm |
| 47 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 48 | Top channel 125x65mm 3200 mm (10.70 kg/m) |
| 49 | Polymeric Disc insulator 70 KN (B&S type) |
| 50 | Disc fitting 70KN |
| 51 | ACSR Dog conductor |
| 52 | Polymeric 33 kv Pin insulater |
| 53 | Complete stay set |
| 54 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 55 | 33 KV Line isolator |
| 56 | Concreting of supports (0.268 cu.m/Pole) |
| 57 | Concreting of stay |
| 58 | Laying of XLPE cable |
| 59 | Making of cable J/Kit S/T & hosting of 33 Kv 3x300 sqmm cable on pole including its jumpring complete covered it in proper way |
| 60 | Earthing , fitting of LSI to the other structure with cost of material |
| 61 | Supply of following materials:- Laying 33 KV XLPE cable through Railway Crossing Near Vishwnathpuri railway crossing for 33 KV JANGAL MOHAL Line Enamated From 132/33 Kv Pirallipur,Mirzapur works site as per RESSPO norms. (Provided by Contractor) |
| 62 | Bolts, Nuts & Washers |
| 63 | HDPE Pipe140 mm |
| 64 | Gi Pipe 6\\" dia for raising the cable |
| 65 | Dropper channel clamp of DP with bolts & nuts |
| 66 | 3x300 sq mm cable clamp with bolts & nuts |
| 67 | Bracing Angle Clamp |
| 68 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 69 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 70 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 71 | Cable Al 3x300 Sq mm XLPE 33 KV |
| 72 | 33 KV Cable J/Kit (3x300 Sq mm) |
| 73 | Dropper channel for DP |
| 74 | GI Wire 6 SWG |
| 75 | ERECTION OF WORK |
| 76 | Bolts, Nuts & Washers |
| 77 | Gi Pipe 6\\" dia |
| 78 | Dropper channel clamp of DP with bolts & nuts |
| 79 | 3x300 sq mm cable clamp with bolts & nuts |
| 80 | Bracing Angle Clamp |
| 81 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 82 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 83 | Cable Al 3x300 Sq mm XLPE 33 KV |
| 84 | Dropper channel for DP |
| 85 | GI Wire 6 SWG |
| 86 | Drilling of Railway Track in very hord rock area & Cable Laying through HDPE pipe |
| 87 | Fitting of Cable route marker with cost material |
| 88 | Making of cable J/K & hanging it on pole including loop & G.I. pipe and earthing |
| 89 | Supply of following materials:- Laying 33 KV XLPE cable through Railway Crossing Near Vishwnathpuri railway crossing for 33 KV PADARI Line Enamated From 132/33 Kv Pirallipur, Mirzapur works site as per RESSPO norms. (Provided by Contractor) |
| 90 | Bolts, Nuts & Washers |
| 91 | HDPE Pipe140mm |
| 92 | Gi Pipe 6\\" diafor raising the cable |
| 93 | Dropper channel clamp of DP with bolts & nuts |
| 94 | 3x300 sq mm cable clamp with bolts & nuts |
| 95 | Bracing Angle Clamp |
| 96 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 97 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 98 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 99 | Cable Al 3x300 Sq mm XLPE 33 KV |
| 100 | 33 KV Cable J/Kit (3x300 Sq mm) |
| 101 | Dropper channel for DP |
| 102 | GI Wire 6 SWG |
| 103 | ERECTION OF WORK |
| 104 | Bolts, Nuts & Washers |
| 105 | Gi Pipe 6\\" diafor raising the cable |
| 106 | Dropper channel clamp of DP with bolts & nuts |
| 107 | 3x300 sq mm cable clamp with bolts & nuts |
| 108 | Bracing Angle Clamp |
| 109 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 110 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 111 | Cable Al 3x300 Sq mm XLPE 33 KV |
| 112 | Dropper channel for DP |
| 113 | GI Wire 6 SWG |
| 114 | Drilling of Railway Track in very hord rock area & Cable Laying through HDEP pipe by |
| 115 | Fitting of Cable route marker with cost material |
| 116 | Making of cable J/K & hanging it on pole including loop & G.I. pipe and earthing Please Enable Macros to View BoQ information |