Name of Work:- Construction of a side footpath in Ward No. 03, Mohalla Badial, extending from Harlals house to Samrat Dhol.
Sl. No.
Item Description
1
Taking out existing CC interlocking paver blocks from footpath/central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. {(131.75x0.735x110.21)/107-99.74
2
Ded the cost of old interlocking tiles
3
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately
4
Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km.
5
WBM Grading 3-Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
6
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in ce pavement (theckness as per design cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel laying and fixing o\f 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrator sand finished in. continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etel & concrete etc. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.