| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | Loose line material ABC 3X50 AND ACSR CONDUCTOR INCLUDING 11KV PIN INSULATOR WITH PIN, ,11KV DISC FITTING 45KN, 11KV INSULATOR 45KN, TOP CHHANEL, M.S. T-OFF CHANEL, STAY COMPLETE, S/S BASE ANGAL, G.I. WIRE, M.S. DROPER ANGAL, STAY COMPLTE,11 KV FUSE SET, DISTRIBUTION BOX etc. |
| 3 | PCC POLE 8.5 METER LONG |
| 4 | ACSR WEASEL CONDUCTOR |
| 5 | 11 KV POLYMERIC PIN INSULATER |
| 6 | 11 KV POLYMIRIC DISC INSULATOR 45 KN |
| 7 | 11 KV DISC FITTING 45 KN |
| 8 | 11/0.4 KV T/F 100 KV |
| 9 | 11/0.4 KV T/F 63 KV |
| 10 | 11/0.4 KV T/F 25 KV |
| 11 | EARTHING COMPLETE |
| 12 | STAY COMPLETE |
| 13 | ABC (3X50+1X35+1X16SQMM) |
| 14 | ABC (3X95+1X70+1X16SQMM) |
| 15 | M.S TOP CHANNEL 125X65X2240MM |
| 16 | M.S TOP CHANNEL(DROPPER) 100X50X2028MM FOR FUSE SET |
| 17 | M S SUB STATION ANGLE |
| 18 | DISTRIBUTION BOX 3 PHASE |
| 19 | LT PVC CABLE 3X150/70 SQMM |
| 20 | LT PVC CABLE 1x120 SQMM |
| 21 | ERRECTION |
| 22 | Erection of D/P by PCC Pole 8.5 Mtr. including digging of Pits & fitting of All accessories. |
| 23 | Erection of PCC Pole 8.5 Mtr. including digging of Pits & fitting of All accessories. |
| 24 | Stringing of ABC (3X50+1X35+1X16)Sqmm as per RESSPO norms |
| 25 | Stringing of ABC (3X95+1X70+1X16)Sqmm as per RESSPO norms |
| 26 | Stringing of ACSR Conductor as per RESSPO norms |
| 27 | Erection of LT PVC CABLE 3X150/70 SQMM as per RESSPO norms |
| 28 | Erection of LT PVC CABLE 1X120 SQMM as per RESSPO norms |
| 29 | Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials. |
| 30 | Grouting of Poles as per RESSPO norms with grouting materials as per RESSPO norms.(All Materials Provided By Contractor) |
| 31 | Mounting of New 100 KVA T/F on DP as per RESSPO norms |
| 32 | Mounting of New 63 KVA T/F on DP as per RESSPO norms |
| 33 | Mounting of New 25 KVA T/F on DP as per RESSPO norms |
| 34 | EARTHING OF POLES & T/F AS PER RESPO NORMS |
| 35 | INSTALLATION 11 KV FUSE SET as per RESSPO norms |
| 36 | PROVIDED BY CONTRACTOR |
| 37 | 11 KV fuse Set |
| 38 | SHACKEL INSULATOR |
| 39 | HOLDING CLAMP WITH NUT & BOLT |
| 40 | L T CLAMP FOR B&N |
| 41 | Barbed wire |
| 42 | B&N FOR SACKLE INSULATOR |
| 43 | DENGER BORD |
| 44 | Lug SUITABLE FOR T/F |
| 45 | P G CLAMP |
| 46 | Stay insulator |
| 47 | L-PIECE SUITABLE FOR T/F |
| 48 | CARTAGE OF TRANSFORMER'S RECEIVED BACK ITEMS FORM SITE TO ESC, RAEBARELI AND WORK SITES ALONG WITH LOADING, UN-LOADING AT BOTH ENDS AND PROPER STACKING Please Enable Macros to View BoQ information |