| 1 | Dismentling of old and damage c.c/Interloking including supply of all material,labour and T&P etc.required for proper completion of work |
| 2 | Disposal of dismentling cc road material with cartage upto distance 3.00 km i/c loading and unloading 80 % of item no-1 including supply of all material,labour and T&P etc.required for proper completion of work |
| 3 | Dismentling of old and damage drain brick work including supply of all material,labour and T&P etc.required for proper completion of work |
| 4 | Deduction of old and workable brick 40% of item no-3 |
| 5 | Breaking of old brick bets for 4cm guage brick ballast 60% 0f item no-3 |
| 6 | Deduction cost of old brick ballast as per item no-4 |
| 7 | Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 8 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 9 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 10 | 1\\" thick P.C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 11 | W.B.M. G-3 (22.4-53 mm stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 12 | Cement Concrete With 2cm gauge approved stone grit, coarse sand & cement in proporation of 4:2:1 in pavement 10cm / as per design thick for c.c road coarse & fine aggregate confirming to IS standard mixed in concrete mixture / plant of not less than 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the form work spreading the concrete with shovels rakes compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curing of concrete pavements for not less than 14 days curing compound (where as specified) and water finishing to lines & grade including supply of all material labour and tools and plants etc. |
| 13 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work |
| 14 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work |
| 15 | Deduction old interlocking tiles i/c all completion of work. Please Enable Macros to View BoQ information |