| 1 | The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 50 Km.) |
| 2 | 33 KV VCB 800A, 750 MVA |
| 3 | CT OD 33 KV CTR 400/100/1-1A |
| 4 | 33 KV line Isolator |
| 5 | Line Isolator |
| 6 | 33 KV Cable Jointing Kit outdoor 3x300 sqmm |
| 7 | 33 KV Cable Jointing Kit Straight through 3x300 sqmm |
| 8 | PCC Pole 11 Mtr. Long |
| 9 | ACSR Dog Conductor |
| 10 | 33 KV XLPE Cable 3x300 sqmm |
| 11 | Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable. |
| 12 | Cable stand StructureFabrication & erection of 33 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 13 | Supply & Laying of 4x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 14 | Supply & Laying of 2x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 15 | Instalation of Lightening Arrestor with StructureFabrication of Lightening Arrestor per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc. (All material will be supplied by the contractor ). |
| 16 | Installation of Line Isolators with StructureAssembling and installation of line/Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 17 | Installation of 33 KV VCB 800 A, 750 MVA |
| 18 | Installation of CT OD 33 KV CTR 400/100/1-1A |
| 19 | Installation of CT with Structure |
| 20 | Dragging of ST/PCC Pole as per RESPO Norms. |
| 21 | Cost of Dead End D/P on 11 Mtr. PCC Pole long with all fitting as per Cost Schudle Annexure-3A (all the material will be supplied by the contractor.) |
| 22 | Cost of Sectional D/P on 11 Mtr. PCC Pole long with all fitting as per Cost Schudle Annexure-2A (all the material will be supplied by the contractor.) |
| 23 | Cost of Exposure D/P on 11 Mtr. PCC Pole long with all fitting as per Cost Schudle Annexure-7A (all the material will be supplied by the contractor.) |
| 24 | Construction of Plinth Foundation of VCB (all the material will be supplied by the contractor.) |
| 25 | Installation of 33 KV VCBInstallation of 33 KV 800A, 750 MVA VCB on 33 KV VCB stracture along with earthing by G.I. Strip 50x6 mm size with main earthmat of switchyard complete in all respect including commissioning. |
| 26 | construction of trunch for control cable (155 mm x250 mm |
| 27 | Road Restroration Charge |
| 28 | Trench Cover (200mmx600 mm) |
| 29 | Stringing, Sagging, binding and jumpering of ACSR Dog Conductor as per RESSPO Norms |
| 30 | 33 KV XLPE cable 3X300 sq.mm Cable Laying in Constructed trench S/C including the opening the trench cover with the help of hydra and after laying closing the trench cover properly. |
| 31 | Laying of 33 KV XLPE Cable 3x300 sqmm underground by HDD (HORIZONTAL DRILL DIRECTION) Method by HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor . |
| 32 | Laying of 33 KV XLPE Cable 3x300 sqmm underground by HDD (HORIZONTAL DRILL DIRECTION) Method by HDD Machine with HDPE Pipe D/CComplete in all Respect as per norms. (All the material will be supplied by the contractor . |
| 33 | Hosting of 33 KV Cable along with fixing of Cable stand ij air including loop |
| 34 | Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 35 | Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 36 | Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
| 37 | Commissioning of all indoor and outdoor equipments |
| 38 | High Pressure Testing |
| 39 | Guarding at road /Electrical line crossing (All material Provided by Contractor) As Per Annexure -13 |
| 40 | Supply of G.I. Pipe 6'' dia |
| 41 | Supply of HDPE Pipe 6'' dia with PN-6 Specification |
| 42 | PWD/NHAI Permission |
| 43 | Rect Back old and used Materials etc. Including Cable Iron Drum to store. Please Enable Macros to View BoQ information |