| 1 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 2 | PART-1 |
| 3 | STRENGTHENING OF 11 KV LINE WORK |
| 4 | STP POLE SPORT 11 MTR LONG |
| 5 | PCC POLE SPORT 11 MTR LONG |
| 6 | ACSR DOG CUNDUCTOR |
| 7 | STAY SET COMPLETE |
| 8 | STAY WIRE / 8 SWG |
| 9 | 11 KV V-CROSS ARM |
| 10 | 11 KV COMPOSITE POLYMER PIN ISULATOR |
| 11 | 11 KV COMPOSITE POLYMER DISC ISULATOR |
| 12 | 11 KV DISC FITTING |
| 13 | EARTHING COMPLETE |
| 14 | G.I WIRE 6 SWG |
| 15 | G.I WIRE 8 SWG |
| 16 | G.I WIRE 10 SWG |
| 17 | GUARDING ANGLE 1.8 MTR |
| 18 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 19 | NUT AND BOLT |
| 20 | STONE PAD |
| 21 | CONCRETING OF POLE |
| 22 | STAY CLAMP |
| 23 | STAY INSULLATOR WITH GST |
| 24 | CONCRETING OF STAY 263 CU.M INCH |
| 25 | RED OXIDE PAINT |
| 26 | ALLUMINUM PAINT |
| 27 | V-CROSS HOLDING CLAMP |
| 28 | F-BRACKET |
| 29 | PG CLAMP |
| 30 | NUT & BOLT AS PER COST SCHEDULE |
| 31 | GUARDING AGNLE CLAMP |
| 32 | EYE BOLT FOR GUARDING WIRE |
| 33 | ERRECTION OF STP POLE SPORT 11 MTR LONG |
| 34 | ERRECTION OF PCC POLE SPORT 11 MTR LONG |
| 35 | ACSR DOG CUNDUCTOR |
| 36 | STAY SET COMPLETE |
| 37 | STAY WIRE / 8 SWG |
| 38 | 11 KV V-CROSS ARM |
| 39 | 11 KV COMPOSITE POLYMER PIN ISULATOR |
| 40 | 11 KV COMPOSITE POLYMER DISC ISULATOR |
| 41 | 11 KV DISC FITTING |
| 42 | EARTHING COMPLETE |
| 43 | G.I WIRE 6 SWG |
| 44 | G.I WIRE 8 SWG |
| 45 | G.I WIRE 10 SWG |
| 46 | GUARDING ANGLE 1.8 MTR |
| 47 | PART-2 |
| 48 | INCREASING CAPACITY WORK OF 100 KVA TF TO 250 KVA TF |
| 49 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 50 | 250 KVA TRANSFORMER AS PER STOCK ISSUE-2025-2026 |
| 51 | L.T CABLE 1X400 SQMM |
| 52 | 3 PHASE D.O. FUSE WITH GST AS PER STOCK ISSUE 2025-2026 |
| 53 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines (All decentralized material will be provided by the contractor) |
| 54 | INSTALLATION OF 250 KV T/F ON NEWLY CONSTRUCTED PLINTH WITH MOUNTING/UNMOUNTING, LOOSING/UNLOOSING OF ALL CONNECTION (COMPLETE JOB) |
| 55 | UNMOUNTING AND UNLOOSING CONNECTION OF OLD 100 KVA TRANSFORMER |
| 56 | AL LUGS FOR 400 SQMM CABLE (Rs. 200/PEC) |
| 57 | PLINTH OF 250 KVA T/F |
| 58 | PIPE EARTHING |
| 59 | FANCING OF 250 KVA T/F |
| 60 | TAIL LESS UNIT 800 AMP |
| 61 | RECEIVED BACK OF 100 KV OLD TRANSFORMER AND OTHER LINE MATERIAL |
| 62 | L.T CABLE 1X400 SQMM |
| 63 | 3 PHASE D.O. FUSE WITH GST AS PER STOCK ISSUE 2025-2026 Please Enable Macros to View BoQ information |