| 1 | Supply of following materials:- Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur (Ikoni) under EDD-Bhadohi total O/H - 1.1 KMthe works site as per RESSPO norms. (Provided by Contractor) |
| 2 | Bolts, Nuts & Washers |
| 3 | F-bracket for 33 KV for PCC/STP |
| 4 | E-Bracket for 33 kv for PCC/STP |
| 5 | PG clamp |
| 6 | Cross arm holding clamp with bolts & nuts for PCC/STP |
| 7 | Stay insulaor |
| 8 | Stay clamp for PCC/STP |
| 9 | Top channel clamp and Dropper channel clamp of DP with bolts & nuts for PCC/STP |
| 10 | Gaurding angle clamp with bolts & nuts for PCC/STP (Market Survey Rate) |
| 11 | Danger Board with clamp for PCC/STP with barbed wire |
| 12 | Bracing Angle Clamp for PCC/STP |
| 13 | Earthing clamp |
| 14 | Stone Pad |
| 15 | Cartage of following materials from ESC, Mirzapur/Bhadohi/Sonbhadra to work site & remaining material from the work site to the ESC, Mirzapur/Bhadohi/Sonbhadra including loading & unloading charge. (Provided by Department) |
| 16 | Pcc Pole 11.0 m long- SP-55 |
| 17 | ST Pole 13.0 m long -SP 70 |
| 18 | ST Pole 11.0 m long -SP 70 |
| 19 | Pcc pole 9 mtr long |
| 20 | 33kV V-Type Steel Cross Arm |
| 21 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 22 | MS angle iron 65x65x6mm, 3.2 Mtr long (5.8kg per mtr) for guarding Angle for DP |
| 23 | Top channel 125x65mm 3200 mm (10.70 kg/m) |
| 24 | Polymeric Disc insulator 70 KN (B&S type) |
| 25 | Disc fitting 70KN |
| 26 | ACSR Dog conductor |
| 27 | Polymeric 33 kv Pin insulater |
| 28 | Extra cost of Stay at right angle (with Stay wire and stay insulator) |
| 29 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 30 | Dropper channel for DP |
| 31 | GI Wire 6 SWG and 10 SWG |
| 32 | ERECTION OF WORK |
| 33 | Bolts, Nuts & Washers |
| 34 | F-bracket for 33 KV for PCC/STP |
| 35 | E-Bracket for 33 kv for PCC/STP |
| 36 | PG clamp |
| 37 | Cross arm holding clamp with bolts & nuts for PCC/STP |
| 38 | Stay insulaor |
| 39 | Stay clamp for PCC/STP |
| 40 | Top channel clamp and Dropper channel clamp of DP with bolts & nuts for PCC/STP |
| 41 | Gaurding angle clamp with bolts & nuts for PCC/STP (Market Survey Rate) |
| 42 | Danger Board with clamp for PCC/STP with barbed wire |
| 43 | Bracing Angle Clamp for PCC/STP |
| 44 | Earthing clamp |
| 45 | Stone Pad |
| 46 | Pcc Pole 11.0 m long- SP-55 |
| 47 | ST Pole 13.0 m long -SP 70 |
| 48 | ST Pole 11.0 m long -SP 70 |
| 49 | Pcc pole 9 mtr long |
| 50 | 33kV V-Type Steel Cross Arm |
| 51 | MS angle iron 65x65x6mm, 4300 mm long bracing |
| 52 | MS angle iron 65x65x6mm, 3.2 Mtr long (5.8kg per mtr) for guarding Angle for DP |
| 53 | Top channel 125x65mm 3200 mm (10.70 kg/m) |
| 54 | Polymeric Disc insulator 70 KN (B&S type) |
| 55 | Disc fitting 70KN |
| 56 | Laying ACSR Dog conductor |
| 57 | Polymeric 33 kv Pin insulater |
| 58 | Extra cost of Stay at right angle (with Stay wire and stay insulator) |
| 59 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. |
| 60 | Dropper channel for DP |
| 61 | GI Wire 6 SWG and 10 SWG |
| 62 | Concreting of supports (0.268 cu.m/Pole) |
| 63 | Concreting of stay |
| 64 | Tree branch cutting Please Enable Macros to View BoQ information |