| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | ACSR Weasel Conductor |
| 3 | Aluminium Cable 1x400 Sqmm |
| 4 | LT ABC Cable (3X120+1X95+1X16) Sqmm |
| 5 | LT ABC Cable (3X95+1X70+1X16) Sqmm |
| 6 | LT PVC Cable (3.5X70/35) Sqmm |
| 7 | LT ABC Cable (3X50+1x35+1X16) Sqmm |
| 8 | PCC Pole 8.5 Mtr Long |
| 9 | 250 KVA T/F |
| 10 | 100 KVA T/F |
| 11 | 63 KVA T/F |
| 12 | 25 KVA T/F |
| 13 | Different Line Material ( XLPE Cable, LT ABC Cable, Conductor, X-Arm,Channel, Insulator , G.I. Wire , Stay wire & Rod, Earth Rod , DB BOX, DO Fuse Set etc.) |
| 14 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 15 | Danger Board with Complete Fitting |
| 16 | Stone Pad |
| 17 | MS Top Channel (100x50x5x2240 mm) |
| 18 | Dropper Channel (100x50x5x228 mm) |
| 19 | MS T Off Chanel (65x65x6 mm) |
| 20 | T/F Base Angle (65X65X6X2028) MM |
| 21 | LT Fuse Set (With SMC Box, Nut Bolt, Clamps & Nut |
| 22 | LT Clamp with Nut & Bolt |
| 23 | Distribution Box Clamp |
| 24 | D P Clamp |
| 25 | Suspension Clamp |
| 26 | Dead End Clamp |
| 27 | I Hook with Clamp |
| 28 | Aluminium Crimping Lug Off Size |
| 29 | LT Pearcing Connector |
| 30 | MS Nut & Bolt |
| 31 | F Clamp |
| 32 | ABC Clamp for Pole |
| 33 | PG Clamp |
| 34 | X arn Holdig Clamp |
| 35 | Number Plate |
| 36 | Barbaid Wire |
| 37 | Holding Clamp for TOP & Dropper |
| 38 | Tailless Unit suitable for 250 KVA T/F with complete protection Panel (Grouting of Panel will also to be done by contractor.) |
| 39 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 40 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 41 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 42 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 43 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 44 | Mounting of 250 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 45 | Mounting of 100 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 46 | Mounting of 63 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 47 | Mounting of 25 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 48 | Laying of LT ABC Cable LT ABC Cable(3X120+1X95+1X16) Sqmm As per respo manual & as per direction of engineer Incharge including the cost of labour,. |
| 49 | Laying of LT ABC Cable LT ABC Cable (3X95+1X70+1X16) SqmmAs per respo manual & as per direction of engineer Incharge including the cost of labour,. |
| 50 | Laying of LT ABC Cable (3X50+1x35+1X16) Sqmm As per respo manual & as per direction of engineer Incharge including the cost of labour,. |
| 51 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ACSR Weasel Conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 52 | Chemical Earthing for 250/100/63 KVA T/F for Neutral as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 53 | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor |
| 54 | FRP Fencing suitable for 250 KVA T/F as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 55 | GI Pipe Bore Earthing 60 Feet Deep for neutral 250 KVA T/F for Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 56 | Erection of 11 KV Do Fuse Set as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 57 | Erection of 3 Phase Distribuiton Box as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 58 | Earthing of Supports as per Standard Specifications & as per RESPO Norms |
| 59 | Dismantling of Old 100/16/10 KVA T/F and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store Panki. Please Enable Macros to View BoQ information |