| 1 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads. Transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2: lead upto of 5.00KM (MORTH--20/305/3.18) |
| 2 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). (DSR-18/16.2) |
| 3 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.(DSR-18/11.2) |
| 4 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 5 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 6 | Providing and laying zig zag Shaped Interlocking tiles Rubber moulded 80mm thick Precast cement concerete having plan dimension 200x(160+120mm) with compressive strength not be less than 40Mpa (M-40) and weight 5kg, laid in required pattern over and including averege 50mm Thick Compacted bed fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with conforming to ISI - 15658-2006 SOR/ A.R. Grey Colour. |
| 7 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 8 | Depth from 0.0 to 1.5M below G.L. |
| 9 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 10 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 11 | M-150 brick work in 1:4 cement & fine sand 2.20 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303/6.02)Same as item no. 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-305/6.04)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(a))As item 303 to 307 above but in superstructure including necessary Cutting & moulding of brick as required thickness of wall not to be less than 1½ brick. Add extra labour to above items. (SOR-20/309/6.07) |
| 12 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 13 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 14 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 15 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 16 | Providing and laying zig zag Shaped Interlocking tiles Rubber moulded 80mm thick Precast cement concerete having plan dimension 200x(160+120mm) with compressive strength not be less than 40Mpa (M-40) and weight 5kg, laid in required pattern over and including averege 50mm Thick Compacted bed fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with conforming to ISI - 15658-2006 SOR/ A.R. Grey Colour. |
| 17 | Granular sub-base with graded material, plant mix method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. MORTH/4.01/401(A) |
| 18 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 19 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 20 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 21 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 22 | M-150 brick work in 1:4 cement & fine sand 2.20 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303/6.02)Same as item no. 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-305/6.04)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(a))As item 303 to 307 above but in superstructure including necessary Cutting & moulding of brick as required thickness of wall not to be less than 1½ brick. Add extra labour to above items. (SOR-20/309/6.07) |
| 23 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 24 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 25 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 26 | Depth from 0.0 to 1.5M below G.L. |
| 27 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 28 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 29 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 30 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 31 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 32 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 33 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |