| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 2 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (DSR-18/15.2.1) |
| 3 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 4 | Cartage of earth or fly ash when added to schedule item no. 253 : 1st Km. (if lead is beyond ½ Km) SOR-20/261(b)) |
| 5 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 6 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 7 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 8 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 10 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 11 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/D/Case-II) |
| 12 | PCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/D/Case-II) |
| 13 | M-150 brick work in 1:4 cement & coarse sand 2.20 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/305(A)) |
| 14 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 15 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 16 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 18/10.25) |
| 17 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DSR-18/10.25.2) |
| 18 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |