|
| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | LOOSE LINE MATERIAL 11 KV XLPE CABLE 3X185,3X120,11 X- ARM , ACSR CONDUCTOR INCLUDING 11KV PIN INSULATOR WITH PIN, 11KV INSULATOR 45KN, STAY COMPLETE, etc. |
| 3 | 11KV XLPE CABLE 3X120 SQ MM |
| 4 | 11KV XLPE CABLE 3X185 SQ MM |
| 5 | 11KV O/D C/J KIT 3X185 SQ MM |
| 6 | 11KV O/D C/J KIT 3X120 SQ MM |
| 7 | 11KV I/D C/J KIT 3X120 SQ MM |
| 8 | PCC POLE 8.5 METER LONG |
| 9 | 11 KV POLYMERIC PIN INSULATER |
| 10 | ACSR WEASEL CONDUCTOR |
| 11 | 11 KV V TYPE X ARM 65X65X6MM |
| 12 | STONE PAD |
| 13 | EARTHING COMPLETE |
| 14 | STAY COMPLETE |
| 15 | ERRECTION |
| 16 | Erection of PCC Pole 8.5 Mtr. including digging of Pits & fitting of All accessories. |
| 17 | Digging of pits, fixing nozzling & grouting of stay rods as per RESPO Normes including grouting materials. |
| 18 | Streinging of ACSR Wesal Conductor on various site 11 KV overd head line as per RESPO Normes. |
| 19 | Fixing of 11 KV \\"V\\" Type X-Arms (65x65x6 mm) as per RESSPO Norms. |
| 20 | Grouting of Poles as per RESSPO norms with grouting materials. (All Materials Provided By Contractor) |
| 21 | EARTHING OF POLES AS PER RESPO NORMES. |
| 22 | Digging of 11 KV 3x185 sq mm XLPE Cable By drill mathod as per RESSPO Norms. |
| 23 | Erection of cable rute marker. |
| 24 | Erection of 11 KV O/D/I/D C/J KIT 3X185,3X120 SQMM. as per RESSPO Norms. |
| 25 | Erection of 11KV 3X120 SQ MM XLPE Cable by MS PIPE 6\\" DIA 3 METER LONG. |
| 26 | Digging of 11 KV 3x120 sq mm XLPE Cable By trunch as per RESSPO Norms. |
| 27 | PROVIDED BY CONTRACTOR |
| 28 | CLAMP FOR 11 KV V TYPE X-ARM |
| 29 | F-CLAMP |
| 30 | DENGER BORD & NUMBER PLAT |
| 31 | G.I BARBED WIRE |
| 32 | NUT BOLT & WARSAR ALLL SIZE |
| 33 | NUMBER PLATE WITH CLAMP AND NUT & BOLT |
| 34 | G.I PIPE 6\\" DIA |
| 35 | CABLE ROUTE MARKER Please Enable Macros to View BoQ information |