| 1 | Dismentaling cement concrete or brick work or granolithic floor including stacking of dismantaled material as directed by Engineer-in-Charge within s distance of 60 meter. |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and work, including T&P and scaffolding wherever necessary, sorting the dismentled material, disposal of unserviceable material and stacking the serviceable material with all and lead of 1000 m as per Tenchnical specification Clause 202. By Mechanical Means Cement Concrete. |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size). |
| 5 | Providing And Layaing in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1:1.5:3 (1 cemnt: 2 coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15\\" landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering. shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of |
| 8 | Brick work with common burnt clay (non modular) bricks of class-150 in fondation and plinth in: Cement motar 1:4 (1 cement: 4 coarse sand) |
| 9 | 12 mm cement plaster of mix: 1:4 (1) cement: 4 coarse sand) |
| 10 | Cartage of earth upto 3.00 km including loading & unloading but excluding stacking on pucca road etc all.complete. Ch-3 (231 a) |
| 11 | S/F of sign Board with pedstal etc all complete. |
| 12 | Sale of mat to contractor old brick etc all complete... |
| 13 | Sale of mat to contractor old brick bats etc all complete. |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form work for (uoto 5th Floor): columns, piers, abutments, pillars, posts, and structs. |
| 15 | Making bandha by sand filling bag including cost of local sand empty cement bag stretching it, laying it in nala and reoving it after dewatering etc all complete |
| 16 | Dewatering of Drain by diesel pumpset etc all complete |
| 17 | TAX18% Please Enable Macros to View BoQ information |