| 1 | Supply of Material |
| 2 | Nut and bolts of various size |
| 3 | LT clamp for PCC pole |
| 4 | Dead end clamp |
| 5 | PG clamp |
| 6 | J Hook |
| 7 | Suspension clamp |
| 8 | Eye Hook |
| 9 | Neutral cum earth wire |
| 10 | Three Phase Distribution Clamp |
| 11 | Erection of Works |
| 12 | Safe Loading, unloading and carriage of other line materials as per estimate from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) |
| 13 | Safe Loading, unloading and carriage of 33 kv Line Isolator (800 A) from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) and erection of it properly as per RESPO norms. |
| 14 | Safe Loading, unloading and carriage of 33 kv outdoor PT (110V) from Store Center Chilbila Pratapgarh to work site and installation of 33 kv PT on structure (2 no.) and foundation (04 no.) with strip earthing of PT and all material for structure, foundation and strip earthing will be provided by contractor as per RESPO norms. |
| 15 | Supply and erection of Delta earthing for body and neutral earthing of power transformer with all material provided by contractor as per RESPO norms. |
| 16 | Supply and erection of Pipe earthing for body and neutral earthing of power transformer with all material provided by contractor as per RESPO norms. |
| 17 | Supply and erection of Pipe earthing of VCB Pannel with all material provided by contractor as per RESPO norms. |
| 18 | Safe Loading, unloading, and carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) and erection of complete Earthing of 8.5 meter PCC Pole or 11 mtr STP pole as per estimate and as per RESPO norms. |
| 19 | Safe Loading, unloading and carriage from Store Center Chilbila Pratapgarh to different work site (Distance 10-70 K.M.) of LT AB cable size 120+3x95+1x16 sq. mm. |
| 20 | Laying of LT AB cable size 3x120+3x95+1x16 sq. mm. Overhead With all fittings as per respo norms in the place of replacement of old and jarjar weasel conductor on existing 8.5 mtr PCC Pole/11 mtr. STP Pole on different sites. |
| 21 | Dismentalling of old existing LT line and proper stacking of conductor in bundles and other line materials in systematic way and safe carriage of received back material from different work sites to the store center Chilbila pratapgarh. |
| 22 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 24 Volt Battery and Battery charger with cabinate as per respo norms |
| 23 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of Chemical Earthing at Power house as per respo norms |
| 24 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 33/11 kv substation class LA 33 kv line side with structure as per respo norms |
| 25 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 33 kv Bus Isolator as per respo norms |
| 26 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 33 kv line Isolator as per respo norms |
| 27 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 11 kv line Isolator as per respo norms Please Enable Macros to View BoQ information |