| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, E.U.D.C.-I, Prayagraj Name of Work: Installation of Additional 250 KVA, 11/0.4KV T/F, Additional AB Cable laying replacement of AB Cable in place of Jarjar/Damaged AB Cable, Works at various Substations under E.U.D.D. Kalyani Devi, Prayagraj Contract No : 07/SE/EUDC-I-Pra/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sr.No. Work Description Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Installation of Additional 250 KVA, 11/0.4KV T/F, Additional AB Cable laying replacement of AB Cable in place of Jarjar/Damaged AB Cable, Works at various Substations under EUDD Kalyani Devi, Prayagraj in Business Plan 2026-27 including loading, unloading & Carriage of materials from Store Center Naini or any other store of PuVVNL (if required) to Work site and vice-versa. |
| 3 | Carriage, Erection and vertical installation of double pole structure using 11-meter long Steel Tubular Poles (STP)/PCC for 11/0.4 kV, 250 kVA transformer mounting. Work includes excavation of pits, grouting with cement concrete mix (1:4:8), and firm erection of poles in line with UPPCL standard construction drawings. The scope further includes supply & installation of all requisite components such as MS top channel (125x65x2240 mm), MS Channel T-off (125x65x1300mm),MS Channel Dropper (100x50x2028 mm), pin insulators with GI pins, Disc Insulator as per requirements, MS bracing angles, GI clamps, base clamps, stone pad, Danger board with clamps nut and bolts, Barbed wire at each Pole. All associated hardware like GI nuts & bolts, washers, fuse wire (HT & LT side of required size) and welding where necessary will be arranged and installed by the contractor only ST Pole will be provided by department . The work shall comply with REC construction practices, UPPCL technical standards, and all site-specific requirements ensuring complete structural and electrical safety. |
| 4 | Carriage & Erection of 8.5/9/11 Mtr. long STP/PCC Single pole (all required material inluding GI Bolts, Nuts and washers, stone pad etc will be arrange by contractor.) |
| 5 | Grouting and Plinthing of 8.5/9/11 Mtr. long STP/PCC pole. Grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr with cement, coarse sand & brick blast in ratio 1:4:8 and 12 mm thick plastering around the plinth in ratio 1:2:4 with 12 mm thickness curing of plinth should be done properly for 11 KV line (All Materials required for Grouting & Plinthing will be provided by the contractor.) |
| 6 | Earthing of Pole by MS earthing Rod of 20x2500 mm and 6 SWG earthing wire (All material including earthing rod will provided by contractor) |
| 7 | Surface preparation and painting of 9/11 Meter long Steel Tubular (ST) pole, including thorough cleaning to remove rust, dust, and grease followed by application of one coat of red oxide zinc chromate primer and one coat of high-grade aluminum paint. The painting shall be carried out using brushes or spraying method as per IS:1477 standards for corrosion protection. The contractor shall arrange all required materials including red oxide primer, aluminum paint, thinners, brushes, scaffolding, and safety equipment. The work must ensure uniform coating and adherence to UPPCL's prescribed specifications for aesthetic finish and weather resistance. |
| 8 | Installation & commissioning of following Distribution Transformer alongwith HT/LT connections including HT Fuse Set Unit, DO, GO & 11 KV TPMO set Complete, required Lug with nuts and Bolts in all respect at Double Pole or at plinth. All terminations must be securely crimped using appropriate size lugs and insulated using heat-shrink sleeves. All pre-commissioning checks—such as continuity testing, insulation resistance (IR) testing, torque verification of terminations, polarity checks, and no-load testing—shall be carried out entirely by the contractor.** The scope of work shall strictly adhere to UPPCL technical specifications and REC construction norms, ensuring safe, durable, and complete energization of installed transformer. (All materials will be provided/arranged by the conctractor at his own cost. Only Transformer will be provided by the Department.) |
| 9 | 11/0.4 KV 250 KVA Distribution Transformer. |
| 10 | 11/0.4 KV 400 KVA Distribution Transformer. |
| 11 | Chemical pipe Earthing of Transformer body and connecting with GI Strip of size 50x6 mm with clamp Separately two point of T/F body. (All materials will be provided by the contractor at his own cost.) |
| 12 | Chemical pipe Earthing of Transformer neutral and connecting with GI Strip of size 50x6 mm with clamp. (All materials will be provided by the contractor at his own cost.) |
| 13 | Supply and Installation of 3 No. 11 KV polymeric Lightning Arrestor (LA) at Transformer DP with structure and commisioning of LAs by making its separately 2 No. earthing and connecting LA base with GI Strip of size 50x6 mm with clamps. The entire installation shall confirm to IS: 3070 (Part-3) and REC construction practices.(All material will be provided/arranged by contractor) |
| 14 | Supply, Installation, testing, and commissioning of 400 Amp L.T. Distribution Box suitable for outdoor use (weatherproof MS cubical enclosure conforming to IS:8623 standards.), comprise 1No. 400A and 3No. 250A tailless fuse unit for outgoing circuits copper busbars of 50 mm x 6 mm electrolytic grade copper strip, duly insulated and supported with porcelain or epoxy insulators to ensure mechanical stability and electrical clearance. The copper strip shall be terminated with crimped lugs, and phase separation shall be ensured with heat-shrink sleeves. cable glands, lugs, interconnections, clamps, nuts & bolts, and all allied accessories required for proper installation and commissioning, including proper grouting of D.B, testing and energization as per relevant IS standards and site requirements. (All materials including DB along with LT Copper Fuse Wire of appropriate size will be arranged by the contractor at his own cost.) |
| 15 | Earthing of L.T. Distribution box by M.S. earthling rod and connecting with G.I. Strips of size 50x6 mm for (LT DB Neutral & Body Separately). The work must be executed as per REC construction norms and UPPCL's approved earthing layout, ensuring a safe and low-resistance path to ground for operational safety.(All required materials will be provided by the contractor including M.S. earthing rod.) |
| 16 | Laying/Hanging of 1x400/1x1000/1x630/1x240/1x70 sqmm L.T. XLPE cable from Transformer to L.T. Distribution Box and from LT Distribution Box to LT overhead line or till connection point. with proper terminatory by lugging and tagging with the help of copper Z/L Clamp each termination shall be covered with LT grade PVC insulation tape to ensure phase identification weather protection and safety. (Only L.T. Cable will be provided by the Department and all other required materials like as Alu. Lug, Z/L Clamps, PVC tape etc. will be arranged by the contractor at his own cost as per site requirement.) |
| 17 | Hanging/Laying and Stringing of LT ABC (3x120+1x95+1x16/ 3x95+1x70+1x16) sq.mm with including binding of insulator complete in all respects. The work includes provision and installation of all required accessories such as dead-end clamps, piercing connectors, suspension clamps with I-hooks, Proper mechanical anchoring and sag control shall be maintained in cable laying. Work shall be executed in accordance with UPPCL standards and REC construction practices of LT AB Cable Line. (All required materials i.e clamp, insulator,IPC, I-hook, Suspension clamp, Eye hook, nut & bolts and any other material as per site requirement will be arranged by the contractor except LT AB cable) |
| 18 | Supply, Erection & Commissioning of three phase LT distribution boxes/kiosk on the LT poles including all clamps & materials required, disconnection and reconnections of existing consumer service cable/line as per requirment & instructions of department and connections & sealing its connection in between Distribution Box & AB cable by using 1x35/16 sqmm. LT PVC cable using crimped lugs and insulated with heat shrink sleevs or LT grade PVC tape with required materials (All required materials including D.B., clamp, insulator, piercing Connector, 1x35 and 1x16 sq mm cable, nut & bolts and any other material as per site requirement will be arranged by the contractor) |
| 19 | Stringing and tensioning of ACSR Dog/Weasel conductor to be used as neutral wire for Low Tension (LT) Aerial Bunched Cable (ABC) system, including installation or replacement as required. The work involves fixing of the conductor on poles using LT clamps, shackle insulators, and associated hardware such as GI bolts, nuts, and washers to ensure proper alignment, insulation, and mechanical stability. Sag and tension shall be maintained in accordance with REC and UPPCL standards. Only the ACSR conductor will be provided by the department (All other materials such as insulators, clamps, binding wire, fasteners, and tools shall be arranged and used by the contractor as per site requirements). |
| 20 | Dismantling of existing 100/250KVA, 11/0.4 kV outdoor distribution transformer from plinth or double pole (DP) structure, including complete disconnection of all HT and LT connections, earthing leads, and associated accessories such as GO switch, fuse set, busbars, clamps, and other fittings. The transformer shall be safely lowered to ground using chain pulley block or crane as per site condition, ensuring no damage during handling. After dismantling, the transformer shall be handed over to the Electricity Store Centre, Naini, Prayagraj as directed by the Executive Engineer (site-in-charge). All tools, lifting arrangements, labor, transportation, and safety equipment shall be arranged by the contractor. The work must be executed strictly in accordance with UPPCL electrical safety regulations and standard dismantling procedures. |
| 21 | Dismantling of existing jarjar/damaged LT AB Cable & bare conductor and carriage back to store centre Naini, Prayagraj. |
| 22 | Hanging of 11 KV XLPE cable of size 3x70/120/185 sq.mm (as per site condition) on existing or newly constructed 9/11 Meter long PCC, STP, or Rail pole. The cable shall be fixed using stay wire and MS stay clamps suitable for the respective pole type, ensuring secure anchoring and maintaining standard clearance. Stay clamps with GI bolts, nuts, and washers shall be arranged and installed by the contractor. Cable alignment shall be straight and sag-free, and all bends shall follow minimum bending radius norms as per IS:1255. The contractor shall ensure mechanical protection, tagging, and safety precautions throughout the execution. Work shall be carried out in accordance with UPPCL specifications and REC construction guidelines. |
| 23 | Laying of LT 3.5x240/400 sq mm LT PVC cable through Horizontal Directional Drilling (HDD method) or manual digging (for manual digging a proper tranch (1050mm deep) should be made & cable shall be laid between Two Continuous row of good quality bricks. River sand packing on all side of cable shall be done.) The stone slab shall be laid on top of rows of the bricks parallel to the ground in such manner so that channels is formed covered in either direction proper route marker should be installed on route (All Material except LT PVC cable will be provided by contractor with road restoretion chargage). |
| 24 | Laying/hanging of 3.5 core L.T. cable of size 400/240/150/70 sqmm for connecting LT box/Distribution Box and ABC including proper lugging, tagging and termination. The cable shall be securely fastened using copper Z/L clamps and covered with LT-grade PVC tape at connection points to ensure mechanical stability and saftey. Work includes dressing, alignment and routing of cable along pole structures or walls as per site requirement. Only the LT cable will be provided by the department. All other materials such as aluminium lugs, copper Z/L clamps, insulation tape, fasteners, and tools shall be arranged by the contractor. Installation shall be carried out strictly in accordance with UPPCL standards IS:732, and REC construction practices for LT power distribution systems. |
| 25 | Supply & Fixing of 11 KV 3X70/3X120/3X185 sqmm O/D, I/D cable Heat Shrinkable jointing kits end terminations.The work shall include preparation of cable ends, stripping, crimping of suitable aluminum lugs, positioning and shrinking of heat shrink sleeves, application of sealing mastic, insulation and stress control tubing, earthing connection, and final sealing. All joints and terminations must ensure moisture resistance, electrical integrity, and mechanical strength, tested prior to energization. Termination boxes shall be mounted properly at designated locations (outdoor, indoor panel boards, or mid-run S/T joints). All materials including jointing kits, lugs, insulation sleeves, hardware, and tools shall be arranged by the contractor. The work shall conform to IS:13573 and UPPCL technical guidelines for 11 kV HT cable termination systems. (All Material to be provided by contractor as per site requirement). Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |