| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, E.U.D.C.-I, Prayagraj Name of Work: Installation of 5 MVA Power Transformer at 33/11 KV Substation Ustapur, & Laying of 33 kv 3x300sqmm cable at 33/11kv substaion Kalyani devi under E.U.C.D.-I, Prayagraj Contract No : 04/SE/EUDC-I-Pra/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Description Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Installation of 5 MVA Power Transformer at 33/11 KV Substation Ustapur, & Laying of 33 KV 3x300sqmm cable at 33/11kv Sub-Station Kalyani Devi Prayagraj including loading of material at store center Naini, carriage and its unloading at dump site and vice versa. |
| 3 | Carriage of the following line material from Store Centre, Naini to 33/11 KV S/s Ustapur. |
| 4 | 11 KV 3x300/185 SQ MM XLPE Cable. |
| 5 | 33 KV VCB and 11 KV Panel with VCB,I/C & O/G, and 11 KV Bus Coupler from Store to dump store/work Site Including loading and unloading. |
| 6 | Carriage of 5 MVA Power T/F from Store Center Naini to Ustapur S/s. |
| 7 | Cartage of 33 KV CT from Store to dump store/work Site Including loading and unloading |
| 8 | Erecting of the following line material at existing Switchyard inside Ustapur, Prayagraj. All other required material to complete the work in all respect will be arranged by the Contractor. Only 5 MVA T/F, VCB. I/C & O/G VCB and XLPE Cable will be provided by the department.) |
| 9 | 5 MVA ,33/11 KV power transformer |
| 10 | 11 KV VCB I/C and O/G /bus coupler |
| 11 | Proper Centrifuging of 5 MVA Transformer Oil after Oil filling on the Existing Plinth before energisation. (Except T/F Oil, all arrangement will be arranged by the Contractor.) |
| 12 | Special earthing of 5 MVA power transformer neutral and body Separately by 03 no GI pipe and 60 feet deep to make delta point and connect with 50x8 mm GI strip as per norms. (required materials like GI pipe, Clamps, nut & bolt, GI strip as per site requirement will be arranged by the contractor) work should be completed as UPPCL norms. |
| 13 | Chemical earthing of VCB panels as per norms. (Required materials like GI pipe, Clamps, , nut & bolt, GI strip as per site requirement will be arranged by the contractor). |
| 14 | Chemical Earthing of all Structures erected in the yard with 35x6 mm. G.I. strip in duplicate fully welded at both ends to be connected to the earth mat, necessary G.I. strip. (All the material shall be provided by the contractor). |
| 15 | Special earthing of lightening arrestor structure with 8 No. additional 40 mm dia 2.5 Mtr. Long G.I. pipe electrodes/rod by digging 3 Mtr. deep pits and connecting it with L.A. through G.I. Strip 35x6 mm welded at both ends. (All the material Like G.I. pipe, G.I. strip etc. shall be provided by the Contractor). Work should be as RESSPO norms. |
| 16 | Laying and stringing of ACSR panther conductor for busbar between busbar gantry as well as terminal gantry. Three phase jumpering from bus to bar L.A, VCB, C.T., P.T., Post insulator, and 33/11 KV T/F, Terminal Gantry, Isolator etc. properly with jumpering with P.G. Clamp, T. Clamp and Post Insulator clamp. (All the material shall be provided by the contractor except ACSR panther conductor .) |
| 17 | Supply, Installation of 12X2 VOLT 200AH Battery and Battery Charger with Cabinet in the switchgear room, by grouting base channel clamp 100 x 50 x 6 x 1000 mm. Fixing of rag bolt. (Battery, Charger, Channel and Clamp will be provided by the contractor) |
| 18 | Painting of all structure and equipment inside the switchyard with two coats of red oxide primer and thereafter two coats of aluminum paint, giving silver white finish, painting is to be done after proper cleaning of the structures. (Paint, primer, thinner etc. required shall be provided by the contractor himself.) |
| 19 | Making Proper connection through control cable from transformer, 33kv VCB, 33kv CT to 33 kv double T/f control panel. (Lugs and all required materials will be arranged by the Contractor.) |
| 20 | Erection, Grouting and earthing of complete structure for Line and Bus Isolator and Installation of 33 KV Line/Bus Isolator with all fitting in switch yard . Work also includes construction of plinth of size 1.0x0.45x0.45 cum with cement, coarse sand and ballast in ratio 1:3:6 and plastering of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. (All Require material as like structure, isolator clamps nut and bolts etc and concreting material like cement, ballast, sand labour Line/Bus Structure with fitting will be provided by the contractor.)The work is to be done strictly as per RESSPO norms. |
| 21 | Erection of complete structure and installation of 33 KV lightening arrestor with earth counter meter, in switchyard. Work includes erection of 3 No.33 KV lightening arrestor, its fitting and mounting with care. Grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.90x0.45x 0.45 cum. Plastering the plinth with cement mortar with cement and sand in ratio 1:4. (All required materials, like structure, isolator clamps, LA, & its structure with fitting, nut and bolts etc. and concreting material like cement, ballast, sand, labour will be provided by the contractor.)The work is to be done strictly as per RESSPO norms. |
| 22 | Construction of complete T/F plinth size 3mx3m x 0.3 Mtr. above the ground level and 0.75 Mtr. Top of plinth is to be C.C. work in the ratio of 1:3:6 fitted with 3 Mtr. long, 90 lbs, 2 No. rail pieces. Cement mortar is to be used in 1:3 ratio. Cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6” stone grit is to be laid before foundation start for whole plinth. All required material shall be provided by the contractor. The work is to be done strictly as per RESSPO norms. |
| 23 | Installation of complete 33 KV VCB 800A ,750MVA with structure in switchyard and grouting of VCB structure by cement, sand, brick ballast mortar in ratio 1:3:4. Work includes complete fitting of VCB on structure carefully with making all connections of control cable for operating the VCB. All Require item like cement, concrete material, T&P and all require clamp nut bolts and clamps.etc shall be provided by the contractor except 33 KV VCB 800A, 750 MVA ,The work is to be done strictly as per RESSPO norms. |
| 24 | Mounting of complete 33 KV C.T 200/100/1-1-1A (03 NO) with structure in switchyard and grouting of C.T. structure by cement, sand, brick ballast mortar in ratio 1:3:4. Work includes complete fitting of C.T. on structure carefully with making all connections of control cable. All required items like, Structure, CT Clamps, cement, concrete material, T&P shall be provided by the contractor except 33 KV C.T. The work is to be done strictly as per RESSPO norms. |
| 25 | Supply, Erection of 33 KV post Insulators with complete structure in Switch yard. Work includes Installation of 2X3 No. 33 KV Post Insulator on each structure complete as per schedule, grouting of Structure with 1st class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.90x0.45x0.45 Cum. The work is to be done strictly as per RESSPO norms. (All the material like Structure, post Insulator, clamp, Cement, concrete material used for above work will be provided by the Contractor.) |
| 26 | Laying of 11 KV, 3x300 sq mm XLPE cable in Kachha by manual method from power T/F out going to feeder Incoming panel as per norms. The cable shall be laid between two continuous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. (All material required for laying will be arranged by the contractor except 11 KV cable) |
| 27 | Laying of 11 KV, 3x185 sq mm XLPE cable in Kachha by manual method from power T/F out going to feeder Incoming panel as per norms. The cable shall be laid between two continuous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. (All material required for laying will be arranged by the contractor except 11 KV cable) |
| 28 | Supply & Laying of following copper control cable form C.T., P.T., T/F to Transformer Control Panel / protection Board. (All control cable shall be supplied by the contractor). |
| 29 | 2x2.5 mm2 |
| 30 | 4x2.5 mm2 |
| 31 | Providing, laying, spreading and compacting 40 mm thick JSB layer with approved quality stone aggregate/grit on prepared surface including carriage, loading-unloading, watering, dressing, rolling and all T&P complete. |
| 32 | Construction of transformer fire wall. as per RESSPO norms. |
| 33 | Supply & Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, 3x185 sq mm XLPE cable. (Jointing kit will be arranged by the contractor). |
| 34 | Outdoor jointing kit 3x 300 sq mm |
| 35 | Outdoor jointing kit 3x 185 sq mm |
| 36 | Indoor jointing kit 3x 185 sq mm |
| 37 | Indoor jointing kit 3x 300 sq mm |
| 38 | Cartage of 33 KV, 3x300 sq mm XLPE cable from Store to dump store/work Site Including loading and unloading |
| 39 | Drilling in all horizontally at Road crossing/Railway Crossing, 1050 mm below from the surface in 8'' dia hole by push on method at 4 Nos. Road/Line Crossing for laying of HDPE pipe (2x50 mtr) and laying of 33 KV, 3x300 sq mm XLPE cable in 6'' HDPE pipe. (HDPE pipe size 6'' dia will be arranged by the contractor and only XLPE Cable will be provided by the department) and other required arrangement for cable laying will be provided by the contractor. |
| 40 | Laying of 33 KV 3x300 sq mm XLPE cable by Machine Drill method after braking of footpath/road. The cable shall be laid at the depth of 1050 mm from the surface of road. (XLPE Cable will be provided by the department). |
| 41 | Hoisting of 33 KV 3x300 sq mm XLPE cable by providing GI pipe of size 6” dia 3 M long on single pole support including its jumpering, complete with clamps, nut & bolts. (Required Allu. Lugs, G.I. Pipe and Clamps with Nuts & Bolts etc. will be arranged by the contractor). |
| 42 | Supply & Fixing of following 33 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 33 KV, XLPE cable (Jointing kit will be arranged by the contractor for the guarantee period of 2 Years from the date of measurement). |
| 43 | Outdoor/indoor jointing kit (3×300 mm2, 33 KV) |
| 44 | Straight through jointing kit (3×300 mm2, 33 KV) |
| 45 | Repairing of existing Telephone lines, Water Lines and Sewer Lines damage during work. |
| 46 | Water Lines |
| 47 | Sewer Lines Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |