|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Rural Engineering Wing Budgam Name of work :- Establishment of Help Desk Counters, Registration counters, alongwith power backup, furniture, IT equipment, Printing equipment , Stationary etc at Railway station Nowgam (Civil Works only) Scheme: SANJY - 2026 Contract No: of 2026-27 DATED: Adv cost =Rs 5.85 LACS Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 15.2.1 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying vitrified floor tiles in sizes 600x600mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to lS: 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete |
| 5 | Painting Enamil Paint of approved brand and manufacture and of required shade to give an even shade two or more coats @3.84kg/10sqm. |
| 6 | Providing and fixing aluminum work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixed with dash fastener of required dia. and size including necessary filling up of gaps at junctions i.e, at top, bottom and sides with required EPDM rubber / neoprene gasket felt etc. Aluminum sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminum snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-Charge. Powder coated aluminum (minimum thickness of powder coated 50 microns). (JS 20102: 101.60 x 44.45 x 2.50 ) |
| 7 | Providing and fixing aluminum work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixed with dash fastener of required dia. and size including necessary filling up of gaps at junctions i.e, at top, bottom and sides with required EPDM rubber / neoprene gasket felt etc. Aluminum sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminum snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-Charge. Powder coated aluminum (minimum thickness of powder coated 50 microns). For shutters of doors, windows & ventilators ncluding providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required & all other accessories (Handles, Tower-Bolt, Al-Drop etc.) (Door Shutters: 85.00 x 44.45 x 2.70; Window Shutter: 50.00 x 44.50 x 2.50) |
| 8 | Providing and fixing 12mm thick prelaminated particle board flat pressed three layer or graded wood particle board (conforming to IS: 12823 Grade-I type-II) in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-incharge. Pre-laminated particle board with decorative lamination on both sides. |
| 9 | Providing and fixing glazing in aluminum door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineerin- charge. (Cost of aluminum snap beading shall be paid in basic item.) With floating glass panes of 4.0 mm thickness (weight not less than 10.00 kg / sqm) |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil : |
| 11 | P/F Concealed LED ceiling lights |
| 12 | Add provisions for Scrapping of paint out side, Que managers unforseen items. (to be paid as per actual Site Requirements) Total in Figures Excess(+) 1.0 Full Conversion INR 585000.56 585000.56 INR Five Lakh Eighty Five Thousand and Paise Fifty Six Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |