Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Mechanical & Hospital Division GMCH Jammu. REPAIR/SERVICING AND MAINTENANCE TO 130 TR CAPACITY CHILLAR PLANT FOR AIR CONDITIONING OF AUDITORIUM INSTALLED AT TERRACE OF GMC, JAMMU MHDJ/e-NIT 56 of 2026-27 Dated: 26.05.2026 Due : 03.06.2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Rate including GST to be quoted by the bidder Rs. P Currency Convertion against each Item Quoted Currency in INR / Other Currency Rebate on old parts in Percentage (%) if any Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Net Cost of item Rs. P TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
Repair and Recharging to the 130 TR capacity Air Cooled AC Chiller plant No including allied works installed for Auditorium of GMC Jammu by way of testing leakage in the plant by filling Nitrogen gas in the system at a pressure of 1.5 times the operating pressure for 24 hours. First the entire system is tested at low pressure to make sure that there are no leaks and then high pressure is applied to the high side only and tested the system for any leaks at its copper pipes. Further the leak is detected by smearing soap/chemical solution all over the joints and pipes and observing the bubble formation. If any leak is detected then its plugged by copper brazing/gas welding method This pressure testing is repeated until there are no more leaks. The system is vaccumised before charging the refrigerant gas for removing air and moisture from the entire system. The system of both the chiller plants is charged with 130 Kg (approx) of R-22 (Refrigerant gas). The job also includes testing of cooling of the AC chiller Plants on fuil load. Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job. Total in Figures 23 23 0.0 23 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.