| 1 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC poleincluding digging and back filling pits in ordinary soil, drawing sufficientlength of GI earth leads to the ground for earthing (excluding provision ofearthing). |
| 3 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 4 | Insertion of one HT PSC pole in existing OH line including digging &backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,drawing sufficient length of GI earth leads to the ground for earthing(excluding provision of earthing). |
| 5 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 6 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 7 | Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 9 | Fitting and erecting one HT PSC Single Pole in position, including fittingcross arm, digging and back filling pit in ordinary soil (as per standards),drawing sufficient length of GI earthing leads from F clamp through Vcross arm to the ground for earthing (excluding provision of earthing) |
| 10 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A typepole in place including excavation, erection of new pole, backfilling pitand refitting of all items etc. and conveyance of all materials except pole. |
| 11 | Additional rate for providing one disc set, PG clamp etc. complete, on anytype of HT pole for making cut point. |
| 12 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing). |
| 13 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 14 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 15 | Dismantling (without damage) one km 11kV line (three conductors)including dismantling cross arm, insulators, disc, disconnecting jumperconnection, rolling the conductor and stacking the materials. |
| 16 | Dismantling (without damage) one km LT three phase 4 wire OH lineconductor by dismantling cross arms, insulators and stacking theconductors in rolls properly. |
| 17 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) afterfitting insulators and giving jumper connections including cutting andremoving tree branches wherever necessary excluding cut point works. |
| 18 | Dismantling (without damage) one km LT additional conductor line,excluding cross arms and insulators. Stacking the conductors in rolls..Rate derived from SAMAGRA Code: 567 after deducting the rate fordismantling 35 nos 2 line cross arms |
| 19 | Stringing, shackling, fitting cross arms, insulators and binding, givingjumper connection etc. using ACSR Rabbit for Phase and ACSR Weaselfor Neutral & Street Main, for one km LT 3ph 5 wire line includingcutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place |
| 20 | Re-Tensioning one span 11kV line including replacing pin insulators, pinbinding, jumpering, replacing insulators cross arms disc, tightening stay,cutting tree branches etc. wherever necessary, including conveyance of allmaterials complete. |
| 21 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 22 | Insertion of one HT A type pole in existing OH line including digging &backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,drawing sufficient length of GI earth leads to the ground for earthing(excluding provision of earthing). |
| 23 | Fitting one set AB switch on existing DP, giving connection and drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing. |
| 24 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 25 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at standard distance(1.5m) away from the pole/structure in ordinary soil & backfilling the pitwith 15cm alternate layer of charcoal, salt and sand up to 90cm from thebottom. including the cost of 20kg salt, 25kg charcoal, excluding supplyof earth pipe. |
| 26 | Fitting one Additional V cross arm in existing single pole includingconveyance of materials. |
| 27 | Fitting and erecting one HT Double Pole Structure using A type pole inposition including fitting 2 No. channel cross arm, digging and backfilling pit in ordinary soil, drawing sufficient length of GI earthing leadsthrough all cross arms to the ground for earthing (excluding provision ofearthing). |
| 28 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), inexisting 11kV DP including conveyance of materials. |
| 29 | Fitting and erecting one HT Double Pole Structure using PSC pole inposition including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads throughall cross arms to the ground for earthing (excluding provision of earthing). |
| 30 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 31 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 32 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. Please Enable Macros to View BoQ information |