| 1 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately)(a) Upto area 2.5 Sq.m |
| 2 | (b) Above area 2.5 Sq.m |
| 3 | Taking out M.S. or W.I. Grills from wooden frame including cutting lugs from masonry wall and refitting the same and mending good damages after repairs. (Excluding the cost of necessary repair of damages) or doing any other necessary works. |
| 4 | Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed. |
| 5 | Taking out old damaged tarfelt from the roof, parapet etc. preparing the roof surfaces by removing all spoils, blisters, moss etc. from the working site and disposal of the same beyond the compound and cleaning the site in all respect as per direction of Engineer-in-Charge. |
| 6 | Taking out rain water down pipe. |
| 7 | Labour for Chipping of concrete surface before taking up Plastering work. |
| 8 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof.(a) upto 150 mm. thick |
| 9 | 1st Floor |
| 10 | 2nd Floor |
| 11 | 3rd Floor |
| 12 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. |
| 13 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. |
| 14 | 1st Floor |
| 15 | 2nd Floor |
| 16 | 3rd Floor |
| 17 | 4th Floor |
| 18 | Expansion joint in floor roof etc. formed with V strips made of 22.5 cm wide strips of 24 gauge aluminium sheets with anchor arm projecting on each side (and end turned ) embedded in adjacent cement concrete, including shaping and finishing the edges on either side of the joint (including the cost of bituminous filler if any) complete as per direction of Engineer-in-Charge. |
| 19 | Labour for propping up overhead members as a precautionary measure against falling as directed with necessary planks, Eucalyptus props, packing nails, wire ropes, iron wires etc. including hire charges of all materials fitting, fixing dismantling and removing the props etc and all ancillary works in this connection complete. |
| 20 | Brick work with 1st class bricks in cement mortar (1:6)(b) In superstructure, ground floor |
| 21 | 1st Floor |
| 22 | 2nd Floor |
| 23 | 3rd Floor |
| 24 | 4th Floor |
| 25 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) inground floor. |
| 26 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 27 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]M 25 Grade(i) Pakur Variety |
| 28 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild SteelI. SAIL/ TATA/RINL In Ground Floor |
| 29 | 1st Floor |
| 30 | 2nd Floor |
| 31 | 3rd Floor |
| 32 | 4th Floor |
| 33 | Cleaning the exposed corroded Reinforcement as well as worn out concrete by sand blasting with air compressor including all materials, hire charges of machineries and labour etc. all complete as per technical specification and direction of the Engineer-in-Charge. |
| 34 | Providing anti-corrosive protective coating to inhibit the corrosion to HYSD reinforcements including two coats of anti-corrosive coatings of consumption as per manufacturer's specification, cleaning etc. complete as per the direction of the Engineer-in- Charge. |
| 35 | Epoxy bonding of new concrete to old concrete |
| 36 | Welding in M.S. structural work with gas or electric:(b) Continuous weld. |
| 37 | Supplying and application of chemical for post Installed rebar connection by using ETA approved for seismic criteria In rebar connection, Including drill/ng hole to the required depth by rotary hammer drill, cleonlng with brush &jet of clean air, /ill/ng chemical usIng serrated noule to eliminate mIxIng error and in a voldless manner IncludIng charges for all tools & plants.Cost of post Installed rebarlng application with chenucal as specified for 25mm dia per cm of depth |
| 38 | Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates,water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000kg/cum, strength not less than 25 MPa andworkmanship conforming to clause 2807.6. (40 mm average thickness.) |
| 39 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting as perTechnical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy. |
| 40 | Sealing of cracks / porous concrete by injection process through nipples/Grouting complete as perTechnical specification.B Cement mortar (1:1) Grouting |
| 41 | Supplying, fitting & fixing of Aluminium fixed partion wall of all aluminium sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, annodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gusket,cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge. (Excluding cost of glass/ panel board, 10-12 Micron thickness Annodizing film. Natural white.a) for unsupported length of vertical member upto 1.50m. height of both ends of vertical member restrained but panel with in 0.90 sqm |
| 42 | Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987;(A) clear, toughened glass conforming to IS: 2553-1992 (part-II)(i) 6mm thick |
| 43 | (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. |
| 44 | 1st Floor |
| 45 | 2nd Floor |
| 46 | 3rd Floor |
| 47 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 48 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar(c) 10 mm thick plaster |
| 49 | 1st Floor |
| 50 | 2nd Floor |
| 51 | 3rd Floor |
| 52 | (i) With 1:6 cement mortar(a) 25 mm thick plaster |
| 53 | 1st Floor |
| 54 | 2nd Floor |
| 55 | 3rd Floor |
| 56 | 4th Floor |
| 57 | Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency](a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana(iii) Area of each Slab/tile exceeding 0.60 sq.m but not exceeding 1.00 sq.m. |
| 58 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.(B) WallWith Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m.(a) Area of each tile upto 0.09 Sq.m |
| 59 | 1st Floor |
| 60 | 2nd Floor |
| 61 | 3rd Floor |
| 62 | (b) Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick) |
| 63 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)(b) Two Coatsi) Water based interior grade Acrylic Primer |
| 64 | Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats)i) Standard Quality |
| 65 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) completeA) UPVC Pipes: (iii) 160 mm. Dia. |
| 66 | B) UPVC Fittings:a) Plain Tee(iii) 160 mm. Dia. |
| 67 | c) Bend 87.5 degree(iii) 160 mm. Dia. |
| 68 | d) Shoe(iii) 160 mm. Dia. |
| 69 | Preparation of drainage spout on roof for bituminous waterproofing treatment after required grading and shaping of the under bed with Cement Concrete (1:2:4) or Cement Mortar (1:4) as directed, Chamfering and moulding the parapet wall to form a bell mouth entry, if required and providing full course treatment with bituminous felt to facilitate quick and smooth drainage of watwr into the down pipes complete including cost of all materials and labour according to satisfaction of the Engineer - in - Charge. |
| 70 | Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials, labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse) |
| 71 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 72 | Add: SGST 9 % + CGST 9% = 18 % |
| 73 | Labour Wellfare Cess 1% Please Enable Macros to View BoQ information |