| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD.By Manual Means |
| 2 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .In all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.upto 3 m depthWith pumping out water excluding shoring |
| 3 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. |
| 4 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. |
| 5 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. |
| 6 | Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.Use River Bazree |
| 8 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.PCC Grade M20Use NB variety stone materials |
| 9 | M.S. work in Rolled steel joists, channels, angles. Tees, plates etc. including hoisting, placing in position including providing staging and removing after completion of works and cutting to sizes as required.(including cost of supply of steel material)(v) Steel plates :(E 250 conforms to IS:2062-2006)(b) 10 – 20 mm. |
| 10 | Welding by gas / electric plant including transportation of welding plant at site including cutting, forging & drilling to required shape. |
| 11 | Providing and metalizing of structural steel surface of bridge members with sprayed aluminium of 99.90% purity with coating of minimum 150micron by two passes as per IS 5905, including supplying of aluminium wires,tools, and plants , consumable etc. or as required for the completion in all respect as directed by the Engineer-in-charge.The surface shall be prepared vby sand blasting throughly cleaned and/or centrifugal blasting,with asuitable abrasive materials like coarse sand in accordance with clause-III of IS 6586 immediately before matelizing,surface shall be made free from grease, scale,dust or other foreign matereials. The work includes supply of abrasive sand , fuel with all transporting, lead, lift and labour charges etc. complete in alll respect. Painting three (3) coats of approved paint on the matelized member to be done as indicated below with the supply of paints and arrangement. 1st coat with Etch primer conforming to IS 5666 followed by 2nd coat with zinc chromate of approved quality conforming to IS104 @ 28-25micron dry film thickness (DFT) followed by 3rd coat with aluminium paint conforming to IS2399,@ 20-25micron DFT each. (Total DFT 190 to 200micron) |
| 12 | Add GST @ 18% |
| 13 | Add Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |