| 1 | Engagement of skilled technician at site for checking and detection of fault of the existing MCC panel part by par as per direction. |
| 2 | Dismantling and taken out the defective components of MCC panel part by part after disconnection of power line by engaging skilled technician as per direction. |
| 3 | Supply, delivery and storage at site the following spares as per sample: |
| 4 | 32 Amps TPN SFU [Make: L&T/ABB/Siemens/Any approved] |
| 5 | 32 Amps fuse link [Make: L&T/ABB/Siemens/Any approved] |
| 6 | 25 Amps TP power contactor [Make: L&T/ABB/Siemens/Any approved] |
| 7 | 25 Amps auxiliary contactor NC [Make: L&T/ABB/ Siemens/Any approved] |
| 8 | 25 Amps auxiliary contactor NO [Make: L&T/ABB/Siemens/Any approved] |
| 9 | 6 Amps SP MCB [Make: L&T/ABB/Siemens/Any approved] |
| 10 | 6 Amps TP MCB [Make: L&T/ABB/Siemens/Any approved] |
| 11 | 10-14 Amps thermal overload relay with mounting kit [Make: L&T/ABB/Siemens/Any approved] |
| 12 | 6 Amps Normal push button Red/Green [Make: ESBEE/ Any approved] |
| 13 | 230 Volt AC indicating lamp Red/Green/ Amber [Make: ESBEE/ Any approved] |
| 14 | 96 Sq. mm. 230 Volt AC Digital ammeter [Make: L&T/ABB/ Siemens/ Any approved] |
| 15 | 30/5 Amps CT [Make: Kappa/Any approved] |
| 16 | 6 Amps 1P 2 way selector switch [Make: Kaycee/ Any approved] |
| 17 | 230 Volt AC on delay timer (0.3 Sec to 30 Hrs.) [Make: GIC/ Any approved] |
| 18 | 415 Volt AC OV/UV/SPP monitoring relay digital [Make: GIC/ Any approved] |
| 19 | Socket, ferrules, MCB channel, cable duct, nuts, bolts, washer and other hard ware materials |
| 20 | 1 sq. mm. single core copper wire for control circuit [Make: KEI/ Polycab/ Any approved] |
| 21 | 2.5 sq. mm. single core copper wire for control circuit [Make: KEI/ Polycab/Any approved] |
| 22 | 4 sq. mm. single core copper wire for control circuit [Make: KEI/ Polycab/ Any approved] |
| 23 | Fitting fixing of the above supplied spare materials as in Sl. No. 3.01 to 3.19 on existing position by engaging skilled technician as per direction of EIC. |
| 24 | Testing and commissioning of the MCC panel at site on load as per direction and upto the entire satisfaction of the EIC. |
| 25 | Add GST @ 18% |
| 26 | Add Cess @ 1% Please Enable Macros to View BoQ information |